Laserfiche WebLink
CC Regular Session 7. 1. <br /> Meeting Date: 05/10/2022 <br /> By: Chi-is Anderson, COMMUnity <br /> Development <br /> Information <br /> Title <br /> Consider Request for an Amended Conditional Use Peen it to Expand an Existing Natural as Substation at 7607 <br /> 173rd Svc.NW(Project No. 22-119); Case of CenterPoint Energy <br /> Purpose/Background: <br /> CenterPoint Energy (the"Applicant")has applied for an Amended Conditional Use Permit to expand their natural <br /> gas substation at 7607 173rd.venue'NW (the"Sub iect Property")with the installation of a 12,000-gallots odorant <br /> tank and associated equipment. <br /> 0 <br /> Notifleation" <br /> The City attempted to send a mailing via Standard U.S.Mail to property owners within 350 feet of the Subject <br /> Property,as noted in the Anoka County Property Records, notifying them.of the public hearing held by the <br /> Planning Commission on April 28,2022.The notice was also published in the Anoka County UnionHerald. <br /> Observations/Alternatives: <br /> The Su bject Property U.; about 13.60 acres in size and is zoned R-1 Residential (Rural Developing).The 2040 <br /> Comprehensive Plan guides the Subject Property as Public. Essential Services are a Conditional Use in the R-I <br /> Residential District. The surrounding properties are zoned R-1 Residential(Rural Development)and are gUided.as <br /> Rural Developing. Surrounding property sizes range from about 0.90 acres(south of 173rd Avenue)to 40 acres. <br /> The Applicant intends to install a 12,000-gallon odorant tank and associated.equipment on the Sinject Property. <br /> Additionally,the Applicant will be adding four(4)inches of class V gravel to the entrances and maneuvering areas. <br /> They are not proposing any modifications to existing access points nor are they proposing any additional access <br /> points. <br /> During the colder,heating season months (generally considered Novernber- March),the Applicant's personnel <br /> would access the Subject Property approximately 3-4 instances per month with 1-ton or 2-ton pick-up trucks that <br /> have been modified to carry the odorant. On site, they would use the storage tank to fill their trucks and then travel <br /> to various odorant injection sites throughout the state to disperse the odorant into the natural gas. The storage tank <br /> itself would require filling about 4 times per year(again,over the colder,heating season months, it would likely <br /> require filling 2-3 times,,and over the remainder of the year,one additional filling). This is accomplished via a <br /> tanker truck. <br /> In addition to the odorant stonage tank, the Applicant is proposing the installation of a small (101 x 1Y)equipment <br /> building, security fencing, a security light,and a twenty-five foot tall flare. The flare is necessary to control <br /> pressure within the storage tank during filling procedures for both the bulk storage tank and the odorant trucks. <br /> Personnel would be on site at a]I times whi le fl ari n cr i s occurring. Flaring would last approximately 20 minutes per <br /> occurrence and would only be done during normal, daytime business hours,reducing the visible light to an almost <br /> non-detectable level. <br /> In the late 1990s, the Applicant received a Conditional Use Permit to add a Peak Shaving Plant to the substation <br /> operation on the Sub j ect Property. That part of the operation ceased in 2003, However,there are still remnants of <br /> that system on the Subject Property. As part of this project,the Applicant would be removing the remain ing <br /> portions of the former tank foundation and building slabs, as well as the old security fencing. As previously noted, <br />