My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/27/2023
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2023
>
Agenda - Planning Commission - 04/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:20:13 AM
Creation date
1/23/2024 11:29:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/27/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
while during the warmer season the tank will only need to be replenished one time. /\colder than <br /> normal heating season typically requires CenterPoint Energy-s supplier to access the site three <br /> times. <br /> [enterPolnt Energy will fill its odorant trucks at this location prior Ln traveling to odorant injection sites <br /> throughout the state. These trucks are 1-ton or 2-ton pickup trucks(Ford F350/F550)that have been <br /> mad ifiedto carry this material. Similar to the replenishment of the bulk storage tank, the frequency of <br /> f III i ng of these trucks wil I vary from year to year and will be weather dependent. During the colder <br /> heating season CenterPoint Energy personnel will need to access this site approximately four times a <br /> month while this site should only need to be accessed twice during the remaInder of the year. <br /> A natural gas flare will be installed and operated at this site. During filling procedures of both the bulk <br /> storage tank and the odorant trucks, pressure within the storage tank will be controlled by flaring. <br /> Filling procedures will only take place during normal daytime business hours reducing the visible light <br /> from the flare flame Loa nearly non-detectable ]ightsource. Flaring procedures are anticipated totake <br /> approximately 20 minutes during each filling occurrence. <br /> 03-24-2022 * CNP Odorant Tank CUP Narrative *2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.