My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/27/2023
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2023
>
Agenda - Planning Commission - 04/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:20:13 AM
Creation date
1/23/2024 11:29:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/27/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 c. The cutting provisions of subsections (a)(2)a and b of this section shall not be deemed to <br /> 2 prevent: <br /> 3 1. The removal of diseased or insect infested trees or of rotten or damaged trees that <br /> 4 present safety hazards. <br /> 5 2. Pruning understory vegetation,shrubs, plants, brushes,grasses,or from harvesting crops, <br /> 6 or cutting suppressed trees or trees less than four inches in diameter at breast height. <br /> 7 (3) Clear-cutting.Clear-cutting anywhere within the Scenic River Land Use District of the Rum River <br /> 8 is subject to the following standards and criteria: <br /> 9 a. Clear-cutting shall not be used as a cutting method where soil, slope, or other watershed <br /> 10 conditions are determined by the zoning authority to be fragile and subject to severe erosion <br /> 11 and/or sedimentation. <br /> 12 b. Clear-cutting shall be conducted only where clear-cut blocks, patches or strips are, in all cases, <br /> 13 shaped and blended with the natural terrain. <br /> 14 c. The size of clear-cut blocks, patches or strips shall be kept at the minimum necessary. <br /> 15 d. Where feasible,all clear cuts shall be conducted between September 15 and May 15. If natural <br /> 16 regeneration will not result in adequate vegetative cover, areas in which clear-cutting is <br /> 17 conducted shall be replanted to prevent erosion and to maintain the aesthetic quality of the <br /> 18 area.Where feasible,replanting shall be performed in the same spring or the following spring. <br /> 19 (6) Grading,filling, alterations of the bed of public waters. <br /> 20 (1) Any grading and filling work done within the Scenic River Land Use District of this section shall <br /> 21 require a permit and shall comply with the following: <br /> 22 a. Grading and filling of the natural topography that is not accessory to a permitted or <br /> 23 conditional use shall not be permitted in the Scenic River Land Use District. <br /> 24 b. Grading and filling of the natural topography that is accessory to a permitted or conditional <br /> 25 use shall not be conducted without a grading and filling permit from the zoning authority. A <br /> 26 grading and filling permit may be issued only if the conditions of the following subsections <br /> 27 (b)(1)c and d of this section are properly satisfied. <br /> 28 c. Grading and filling of the natural topography which is accessory to a permitted or conditional <br /> 29 use shall be performed in a manner which minimizes earthmoving, erosion,tree clearing, and <br /> 30 the destruction of natural amenities. <br /> 31 d. Grading and filling in of the natural topography shall also meet the following standards: <br /> 32 1. The smallest amount of bare ground is exposed for as short a time as feasible. <br /> 33 2. Temporary ground cover such as mulch is used and permanent ground cover such as sod, <br /> 34 is planted. <br /> 35 3. Methods to prevent erosion and to trap sediment are employed. <br /> 36 4. Fill is stabilized to accepted engineering standards. <br /> 37 (2) Excavation of material from, or filling in a wild, scenic or recreational river, or construction of <br /> 38 any permanent structures of navigational obstructions therein is prohibited unless authorized <br /> 39 by a permit from the commissioner of DNR pursuant to Minn. Stats. § 103G.245. <br /> 40 (3) Drainage or filling in of wetlands is not allowed within the Scenic River Land Use District <br /> 41 designated by this subdivision. <br /> 42 (C) Utility transmission lines. All utility transmission crossings of land within the Scenic River Land Use <br /> 43 District designated by this subdivision shall require a conditional use permit. The construction of <br /> 44 such transmission services shall be subject to the standards and criteria of Minn. Rules pt.6105.0170. <br /> 45 No conditional use permit shall be required for high voltage transmission lines under control of the <br /> 46 environmental quality council pursuant to Minn. Stats. § 216E.10. <br /> 47 (D) Public roads. In addition to such permits as may be required by Minn.Stats.§103G.245,a conditional <br /> 48 use permit shall be required for any construction or reconstruction of new public roads within the <br /> 49 Scenic River Land Use District of this subdivision.Such construction or reconstruction shall be subject <br /> Page 143 of 147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.