Laserfiche WebLink
05/30/2023 12:06 PM <br /> C-520 LANDSCAPE DETAILS.pdf V1 -Changemark Notes ( 7 Notes ) <br /> 1 - Pruning Cuts <br /> Created by: Chris Anderson <br /> On: 05/26/2023 09:04 AM <br /> Do not make flush cuts. The branch bark collar and ridge shall remain in tact. <br /> ---------0 Replies --------- <br /> 2 - Root Flare <br /> Created by: Chris Anderson <br /> On: 05/26/2023 09:06 AM <br /> Root flare shall be flush with finished grade or no more than 2"above finished grade. <br /> ---------0 Replies --------- <br /> 3 - City Approval Required <br /> Created by: Chris Anderson <br /> On: 05/26/2023 09:08 AM <br /> Any deviations from the approved landscape plan require prior approval of the City. <br /> ---------0 Replies --------- <br /> 4 - Warranty <br /> Created by: Chris Anderson <br /> On: 05/26/2023 09:09 AM <br /> The Developoment Agreement will require a 2-year warranty period. <br /> ---------0 Replies --------- <br /> 5 - Parking Lot Islands <br /> Created by: Chris Anderson <br /> On: 05/26/2023 09:10 AM <br /> Do not use riverrock in the parking lot islands. This must be an organic material such as <br /> hardwood mulch. <br /> ---------0 Replies --------- <br /> 6 - Topsoil <br /> Created by: Chris Anderson <br /> On: 05/26/2023 09:11 AM <br /> Add note to either this sheet or the Landscape Plan stating that 4 inches of topsoil, with no more <br /> than 35% sand content is required over all disturbed areas not otherwise improved with <br /> impervious surfacing. A topsoil inspection is required prior to installation of landscaping. <br /> Page 1 <br />