Laserfiche WebLink
and Armstrong Boulevard, and has indicated that another industrial development is in the planning stages (would <br /> be BLIP building 8). While not part of the original BLIP industrial park,this land abuts BLIP, and it would be <br /> reasonable to allow landscaping for that site to count toward the reforestation standards, should that be of interest <br /> to the Applicant. <br /> Landscape Plan <br /> The submittal does include a Landscape Plan not only for Lot 1,where building 5 will be constructed,but also for <br /> Lot 2 as well(not currently slated for building improvements). The proposed species are generally acceptable and <br /> the proposed plantings meet the canopy cover requirements for the E-3 Employment District. <br /> The property does abut existing residential homes along the western boundary of the plat and thus, a bufferyard is <br /> required. However, in the early stages of both BLIP and Riverstone North, the Applicant worked with Capstone <br /> (developer of Riverstone North)to proactively account for future industrial development by providing not only <br /> the space for the berm,but the material as well. The Site Plan does provide the required bufferyard width of sixty <br /> (60) feet and, in fact,provides much greater separation as there is a stormwater pond near the western boundary as <br /> well. Thus,there is about 150 feet separating the boundary of residential from the parking and maneuvering area <br /> of building 5. <br /> Funding Source: <br /> All costs associated with this request are the Applicant's responsibility. <br /> Action: <br /> Motion to recommend approval of the natural resources aspects of the proposed plat and site plan, contingent <br /> upon compliance with Staffs review comments. <br /> Attachments <br /> Site Location Map <br /> Site Plan <br /> Final Plat <br /> BLIP Building 5 Elevations <br /> Overall Landscape Plan <br /> Form Review <br /> Inbox Reviewed By Date <br /> Brian Hagen Brian Hagen 06/07/2023 12:40 PM <br /> Form Started By:Chris Anderson Started On:05/30/2023 12:17 PM <br /> Final Approval Date:06/07/2023 <br />