Laserfiche WebLink
Table 7-Design Year(2040) Build Intersection Analysis(Cont.) <br /> Lord of Life SimTraffic Delay Summary - PM 2040 Build Peak Traffic <br /> IOperations by Movement Overall <br /> Left Through Right Intersection <br /> Intersection Control Approach <br /> Delay LOS Delay LOS Delay LOS Delay LOS <br /> (sec/veh) (sec/veh) (sec/veh) (sec/veh) <br /> EB 18.4 C 14.1 B 3.1 A <br /> CSAH 5& Minor WB 19.3 C 17.1 C 3.9 A <br /> Sunwood Road 19.3 C <br /> Drive Stop NB 5.0 A 5.5 A 1.6 A <br /> SB 1.0 A 1.1 A 0.2 A <br /> Sunwood Minor EB 0.0 1.4 A I 0.5 I A <br /> Drive& � <br /> Road WB 2.6 A 1.2 A 0.0 A 9 A <br /> 2I I <br /> Cobalt NB - - - - 2.9 A <br /> Street Stop <br /> SB - - - - - - <br /> EB 67.0 57.6 7.6 A <br /> M N-47& W B 59.4 59.9 10.5 B <br /> Sunwood Signal 14.7 B <br /> Drive NB 76.1 13.0 B 7.1 A <br /> SB 62.4 5.2 A 0.4 A <br /> EB 17.5 �I 0.0 A I 3.0 I A <br /> CSAH 5& Minor B _ <br /> 146th Road W 11.3 B 0.0 A - 17.5 C <br /> Avenue Stop NB 2.1 A 1.2 A 0.4 A <br /> SB 1.5 A 0.8 A 0.1 A <br /> CSAH 5& Minor WB 14.1 B - - 3.6 A <br /> Lord of Life Road NB _ _ 1.1 A 0.7 A 14.1 B <br /> Access Stop <br /> SB 3.8 A 0.7 A - - <br /> E B 13.5 �I - - I 5.1 I A <br /> CSAH 5& Minor Wg 18.5 �I - - I 6.5 � A <br /> Iodine Road 18.5 C <br /> Street Stop NB 0.2 A 2.1 A 0.7 A <br /> SB 6.9 A 1.1 A 0.0 A <br /> EB - - 2.1 A 0.6 A <br /> CSAH 5& Minor WB 8.2 A 3.1 A - - <br /> Dysprosium Road 20.4 C <br /> Street Stop NB 20.4 C - - 5.3 A <br /> SB - - - - -EB 70.1 �I 38.3 D I 2.7 I A <br /> MN-47& WB 51.2 �I 48.0 D I 29.7 C <br /> CSAH 5 Signal NB 50.7 D 11.8 B 2.5 A 25.0 C <br /> SB 51.6 D 26.6 C 6.6 A <br /> With additional site traffic and background traffic growth, the study area intersections are projected to <br /> experience some change in delay, with some of movements and approaches projected to operate at a <br /> lower LOS as compared to Opening Year (2027) Build Conditions. The network is not expected to need <br /> significant mitigations along the corridor in order to operate at acceptable levels. Some minor changes at <br /> Haviland Fields-Ramsey, MN <br /> Traffic Impact Analysis I July 2023 <br />