Laserfiche WebLink
Table 8. Wells <br /> Well ID Well Static Well <br /> Number Status Well Name Water - . <br /> Level (ft) <br /> 430267 Active STEEN ERSON,LARRY 24 187 4/15/1991 Onsite <br /> 668043 Active LORD OF LIFE 28 147 3 11 2002 Onsite <br /> LUTHERAN CH / / <br /> b. Describe effects from project activities on water resources and measures to minimize <br /> or mitigate the effects below. <br /> i. Wastewater— For each of the following, describe the sources, quantities, and <br /> composition of all sanitary, municipal/domestic, and industrial wastewaters <br /> projected or treated at the site. <br /> 1) If the wastewater discharge is to a publicly owned treatment facility, <br /> identify any pretreatment measures and the ability of the facility to handle <br /> the added water and waste loadings, including any effects on, or required <br /> expansion of, municipal wastewater infrastructure. <br /> The daily wastewater flow for the proposed development was calculated by <br /> utilizing the Metropolitan Council Sewer Availability Charge (SAC) Criteria <br /> Calculator to determine the equivalent number of SAC units for the proposed <br /> residential units on site. The proposed 498 units, along with the existing church, <br /> yielded a total of 500 SAC units for the proposed development. A flow of 274 <br /> gallons per day (GPD) per SAC unit (per Metropolitan Council) was used to get an <br /> estimated daily sewage flow of 136,452 GPD for the proposed development. <br /> The property will be served by the publicly owned Metropolitan Council <br /> Metropolitan Wastewater Treatment Plan in Saint Paul. The plant currently treats <br /> an average of 172 million GPD, with a total capacity up to 251 million GPD. Based <br /> on the Twin Cities Metropolitan Council Sewer Availability Charge Guidelines, the <br /> estimated wastewater from the proposed development is anticipated to consist <br /> primarily of normal commercial sewage resulting from the proposed residential <br /> and institutional areas on site. The proposed site is expected to generate <br /> approximately 136,452 GPD (0.1364 million GPD). The Metropolitan Council's <br /> Metropolitan Wastewater Treatment Plan has the capacity to treat the volume <br /> and composition of wastewater generated by the proposed project without <br /> pretreatment or other plan facility improvements. It is anticipated that the 8" <br /> stubs on the property will be able to handle the added water and waste loadings, <br /> although additional expansion or reconfiguration of existing sanitary sewers may <br /> be required. <br /> 2) If the wastewater discharge is to a subsurface sewage treatment system <br /> (SSTS), describe the system used, the design flow, and suitability of site <br /> conditions for such a system. If septic systems are part of the project, <br /> describe the availability of septage disposal options within the region to <br /> Haviland Fields EAW 13 July 2023 <br />