Laserfiche WebLink
Table 8:LOS Summary <br /> Intersection <br /> . . . <br /> Scenario i Drivei i i i • • i <br /> Sunwood Cobalt Sunwood 146th of Life Iodine Dysprosium & <br /> Drive Street . . • <br /> Avenue Access Street <br /> Delay <br /> 13.9 4.5 7.2 10 2.3 10.1 15.2 16.8 <br /> AM (s) <br /> LOS B A A A A B C B <br /> Existing Delay <br /> 28.6 4.5 13.1 4.6 2.4 40.2 8.4 20.4 <br /> Year PM (s) <br /> (2023) LOS D A B A A E A C <br /> Delay <br /> 8.5 2.1 7.1 4.3 2.6 6.1 8.4 17.3 <br /> Sunday (s) <br /> LOS A A A A A A A B <br /> Delay <br /> 11.8 4.4 8.7 9.8 1.4 8.9 14.1 17.1 <br /> AM (s) <br /> Opening LOS B A A A A A B B <br /> Year Delay <br /> 20.2 2 12.7 14.5 0.8 7 18.7 21.5 <br /> (2027) PM (s) <br /> No- LOS C B B B A A C C <br /> Build Delay <br /> 7.8 2 7 4.2 5.5 9.8 4.6 20 <br /> Sunday (s) <br /> LOS A A A A A A A B <br /> Delay <br /> 13 4.6 8.8 6.4 10 24.5 25.2 17.6 <br /> AM (s) <br /> LOS B A A A A C D B <br /> Opening <br /> Delay <br /> Year 20.6 4.6 8.5 19.2 0.7 26.8 18.5 21.7 <br /> P <br /> (2027) M (s) <br /> Build LOS C A A C A D C C <br /> Delay <br /> 19.2 4.1 8.4 15.3 2.5 19.5 25.1 17.3 <br /> Sunday (s) <br /> LOS C A A C A C D B <br /> Horizon Delay 15.4 4.2 8.2 10.6 3.1 25 18.1 17.7 <br /> AM (s) <br /> Year LOS C A A B A C C B <br /> (2040) <br /> Delay <br /> No- 15.8 4.1 14 10.7 14.1 15.4 17 22.7 <br /> Build PM (s) <br /> LOS C A B B B C C C <br /> Haviland Fields EAW 30 July 2023 <br />