My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/25/2024
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2024
>
Agenda - Planning Commission - 01/25/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:29:50 AM
Creation date
1/23/2024 1:43:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.02. That the Applicant shall be responsible for all City costs incurred in administering and <br /> enforcing this Permit. <br /> 1.03. Easement review by the City Engineer. <br /> 1.04. Standard development and park/trail dedication fees shall be paid for all lots created by <br /> this Plat, except Outlot G. Fees on Outlot G will be charged at the rates in effect at the <br /> time of its subdivision. <br /> 1.05 Outlot K as shown on the preliminary plat, shall be platted as a Lot and Block. <br /> Development fees for this lot shall be charged at the rates in effect at the time of its <br /> subdivision. <br /> Section 2. Site Plan Review Requirements <br /> 2.01. This Site Plan Review approval is based on site, architectural, preliminary utility, grading, <br /> and landscape plans dated January 15, 2024. The applicant is authorized to proceed to <br /> construction plans. <br /> 2.02. That the Applicant shall provide upgraded side building elevations that show enhanced <br /> design, per the COR Framework requirements, on the following units where a side faces a <br /> public roadway, private roadway, or a walkway: <br /> Lots 1 and 6, Block 1; <br /> Lots 1 and 14, Block 2; <br /> Lots 1 and 14, Block 3; <br /> Lots 1 and 6, Block 4; <br /> Lots 1 and 10, Block 5; <br /> Lots 1 and 3, Block 6; <br /> Lots 1 and 18, Block 7; <br /> Lots 1 and 9, Block 8; <br /> Lots 1 and 4, Block 9; <br /> Lots 1 and 7, Block 10; <br /> Lots 1 and 11, Block 11; <br /> Lots 1 and 8, Block 12 <br /> 2.03. That the Applicant enter into a Development Agreement with the City including standard <br /> site guaranty prior to issuance of a building permit or commencement of site <br /> improvements. <br /> 2.04. Approval by the Lower Rum River Watershed Management Organization. <br /> 2.05. Due to roadway construction anticipated for Zeolite Street NW, installation of trees near <br /> the eastern property line may be deferred until after the roadway is complete. <br /> RESOLUTION#24-041 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.