My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:08:07 AM
Creation date
2/14/2024 1:04:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br /> Background + Purpose <br /> Overview Outcomes+ Deliverables <br /> The purpose of the Center Street Area Framework+ Policy Plan is to advance the planning As indicated the above project listingis <br /> activityfor several interrelated projects within this district.Several of these project have p J <br /> P J p J merelya summaryoutline of the work to be <br /> timelines that require the work to commence as soon as possible.A summary list of current <br /> and potential projects includes: <br /> performed;the detailed Scope of Services <br /> P pJ <br /> •Center Street sidewalk(s)in front of the Sapphire building; (provided by the Consultant Team),will <br /> •Center Street streetscape/trail(west side)near the interface of the Affinity and Municipal result in design guidelines to allow the city <br /> Plaza; to develop specifications(cross-sections <br /> • Municipal Plaza(north)at the interface with Affinity; with details)such that may be <br /> q y <br /> • Municipal Plaza(south)the larger Happy Days site; sought for work that must be completed <br /> • PumpHouse Plaza the immediate) surroundingthe small Pump House No. g P <br /> y p like the sidewalk/streetsca e adjoiningthe <br /> • Pump House Exterior potential facade improvements; p <br /> • 145th Avenue sidewalk connecting to Center Street. Sapphire budding. Additionally,the scope <br /> and cost of other features may be better <br /> understood,and accordingly,will result in <br /> the ability to proceed with improvements to <br /> Y <br /> Municipal Plaza,and the Pump House site <br /> NO <br /> ''� •• <br /> r� (plaza,concrete,landscaping and conceiv04 <br /> - <br /> } ; I _ - ably an attached public restroom at such <br /> .° q3 <br /> - time it is authorized by City Council,(in <br /> a• <br /> • a 1y <br /> raw 2020 or2021). <br /> •1 <br /> Further,the above referenced Scope of <br /> Services will develop the design for the <br /> ' Pump House facade and related <br /> r architectural treatments,and result in a <br /> 16 <br /> Design-build RFP that will provide City <br /> m <br /> Irtf,mlr#•• <br /> f - Council with the cost and contractor(upon <br /> r , SIP approval)that can complete the2020 <br /> ° <br /> �_ IX <br /> Capital Improvement Project for Municipal <br /> e ■ <br /> a®Y`�' '� �' Pump House#3. <br /> 1 , e <br /> a !PWANM — <br /> 1 <br /> C4w1�pF1� i •. <br /> �vfiFtipoF ATc9drp <br /> �1A241 i k'�r�lrrpl+*■i <br /> d <br /> L �aa i <br /> a r � • <br /> IN <br /> r <br /> ■' v rw <br /> Rge 11AW <br /> + 1 , • JL <br /> k , <br /> NN, <br /> • , ... e <br /> r <br /> ti r <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.