Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br /> M <br /> L <br /> r <br /> ■ <br /> e a - <br /> ➢ I J Y . <br /> e <br /> 40 • AL1 <br /> ■ <br /> a <br /> t J <br /> _ .s . <br /> ��_� <br /> _ r <br /> ■ e i � o I a ■ a <br /> J = _ <br /> ■a I , <br /> ■ <br /> 1 <br /> — <br /> ILNLa <br /> IF I <br /> e <br /> Restroom + Ma*intenance Bldg <br /> PROJECT DESCRIPTION - � a <br /> A proposed Restroom + Maintenance Buildingwill be sided with the same materials as the <br /> adjacent Pump House#3.This building will support community activities at Center Street's <br /> Municipal Plaza.It will also house equipment for the plaza's irrigation system and for the -~ ti <br /> solar array at the Pump House building. IF <br /> Note:the sequence of project design and construction will begin with Pump House - <br /> npa <br /> FC-;A TAN <br /> Building facade improvements,followed by Pump House Plaza site and landscape <br /> RESTROONV5 AND EQU MERIT RCC&IS PLM <br /> improvements,and then additional project feasibility evaluation and detailed design <br /> related to the Rest Room + Maintenance Building. <br /> 11 <br />