My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:08:07 AM
Creation date
2/14/2024 1:04:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br /> 1 <br /> ° <br /> 10' concrete walk <br /> A pa,rtrnents <br /> Stormwater catchment basins <br /> F 9 . <br /> Parallel parking bay <br /> 3 d <br /> s <br /> s <br /> 1 <br /> ,1 <br /> A p a rams nts <br /> SOLAR CA Nopy <br /> s MA I NTF NAN ff A 17C ES5(I? <br /> r <br /> f <br /> CHatfal Anoka <br /> r <br /> Courmy Regional <br /> TraiI Future Pump House Plaza <br /> Fu rn p House Building <br /> IN I <br /> _ Fad d e I.rn p°rove me rats <br /> F 4 t u r A11^ <br /> u n i ci pa I Plaza l ° <br /> 1 <br /> Sappph*ire The Sapphire Apartment Frontage will be the <br /> PROJECT D E S C R I P T I O N first segment of public(pedestrian)realm to <br /> be completed,and as such plays an <br /> The Concept Site Plan for the Sapphire Apartment Frontage along the east side of Center important role in establishing these elements <br /> Street includes three primary elements: as the benchmark for future projects along the <br /> • A 10'wide concrete walk; east side of Center Street.A gracious walkway <br /> • Stormwater catchment basins; width(10'),connected stormwater basins,and <br /> • Parallel parking bay. landscape plantings that complement existing <br /> streetscape,will not only further enhance the <br /> desired Downtown District street character,but <br /> also set design expectations for Pump House <br /> Plaza and the now-vacant development site at <br /> Su nwood Drive. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.