My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:08:07 AM
Creation date
2/14/2024 1:04:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br /> -- - -------------------- 1 11 <br /> 1 <br /> --- i <br /> � �-----� Replace existing <br /> to match new curb <br /> and gutter, storm <br /> - <br /> Parallel parking' Paralll kin water catchment <br /> f p , <br /> b (both sides basins and other <br /> ay ) , <br /> proposed improve- <br /> ments in this area. <br /> I <br /> ' `Stormwater Keep existing curb/ <br /> 1 <br /> catchment gutter, concrete <br /> basins walk/Regional Trail <br /> 1 <br /> 1 , <br /> and street pave- <br /> 1 <br /> 1 ment in this area. <br /> A._ih-um <br /> 1 a <br /> 1 <br /> 1 a <br /> i . er 3 _4 <br /> Center Street ID <br /> ,d. <br /> Concept Plan <br /> L - <br /> Regional Stormwater Catchment Parallel 10'Wide <br /> Trail Basin(both sides) Parking Bay(both Concrete Walk <br /> sides) <br /> Center Street It's important to note however,that this <br /> PROJECT D E S C R I P T I O N document also presents a somewhat <br /> cautious approach,seeking to minimize <br /> The primary purpose of the Conceptual Site Plan for Center Street is to illustrate how this key disruption to existing Center Street im- <br /> P 9 <br /> north/south connector ties together all the other pieces of this Framework+ Policy Plan. rovements.The basic objective is to work <br /> P J <br /> At the same time,it also promotes various opportunities for innovative district infrastructure with existingcurb lines,parking bays and <br /> p 9 y <br /> as an integral part of current and proposed street,park,trail and private development other pavement dimensions as the starting <br /> g <br /> project design-suggesting shared systems for stormwater capture/reuse,energy P completing point for com letin street construction to <br /> production/distribution,waste handling/recycling and other technologies. Ramsey Parkway and northward to Bunker <br /> Lake Boulevard.(Also refer to the Sapphire <br /> Apartments Frontage and Central Anoka <br /> County Regional Trail information in this Plan) <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.