My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:08:07 AM
Creation date
2/14/2024 1:04:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRESH <br /> 0 <br /> Office: 651-447-2218 <br /> Date 10/25/2023 <br /> We are pleased to submit a proposal for the following project: <br /> Ramsey MN WTP <br /> For the following sections: <br /> Revise project to include prevailing wages <br /> Our Proposal is for: <br /> Two hundred twenty-eight thousand,forty-two dollars. $228,042o 00 <br /> RFP dated: 10/17/2023 <br /> Addenda: N/A <br /> Unit Prices: None <br /> Allowances: None <br /> Alternates: None <br /> OUR BASE BID INCLUDES: <br /> 1. Prevailing wages as of 10/17/2023,including additional taxes,unemployment insurance costs, and back- <br /> office burden for prevailing wage reporting. Project schedule will be impacted by the inability to utilize <br /> commercially viable overtime labor if needed,though schedule impacts are not possible to quantify at this <br /> time. Highway/heavy rate for painters is $70.39 per hour. <br /> OUR BASE BID DOES NOT INCLUDE: <br /> 1. Any bonds required by Owner or GC. <br /> 2. Pipe labeling. <br /> 3. Temp heat—indirect, externally-vented temp heat to be provided by GC or Owner if needed. <br /> OTHER BID NOTES: <br /> 1. All paint systems included in this bid will be Sherwin-Williams products.Where factory/shop priming is <br /> required by spec,please ensure manufacturers are using the appropriately compatible Sherwin-Williams <br /> primer. <br /> SETTING THE STANDARD.BETTER BLASTING.PERIOD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.