My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:08:07 AM
Creation date
2/14/2024 1:04:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 5. <br /> CC Regular Session <br /> Meeting Date: 02/13/2024 <br /> Primary Strategic Plan Initiative: Connect the community through Parks,Trails and Recreational Programming. <br /> Information <br /> Title <br /> Approve Landscape for Central Park Main Parking Lot Reconstruction, Improvement Project#23-02 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to complete the Central Park Main Parking Lot Reconstruction, Improvement Project <br /> #23-02 by the addition of trees, shrubs, and irrigation within the two new median swales at the park. <br /> Background: <br /> City Improvement Project#23-02 entailed the reconstruction of Central Park's main parking lot in 2023. The <br /> preponderance of that project has been successfully completed remaining is the landscape elements for the <br /> drainage swales. <br /> Project History: <br /> •April 12, 2022, Resolution#22-089, the Ramsey City Council accepted a proposal for a topographic survey <br /> of the project area from Bolton&Menk. <br /> •June 21, 2022,the Ramsey Public Works Committee (PWC)reviewed bicycle and pedestrian facilities as <br /> part of the 161St Avenue Street Reconstruction. The PWC recommended extending pedestrian facilities with <br /> a goal of minimizing tree impacts and existing park facilities. Those recommendations were incorporated <br /> into the parking lot reconstruction plans. <br /> •November 10,2022, the Ramsey Park and Recreation Commission(PRC)had a discussion of the proposed <br /> Central Park parking lot reconstruction as part of consideration of the 2023 —2032 Parks Capital <br /> Improvement Plan. The PRC supported the project in general, specifically using medians to collect <br /> stormwater runoff and provide shade trees. Additionally,using the available green space adjacent to the <br /> parking lot to increase the footprint of the parking lot,while not losing trees. The PRC supported a one-way <br /> directional parking lot layout to increase safety for pedestrians,but also to maximize stall count if possible. <br /> •November 15,2022, the PWC recommended City Council authorization to prepare plans and <br /> specifications. The PWC generally supported the project, including creating the medians to provide shade <br /> trees,using the available green space adjacent to the parking lot to increase the footprint of the parking lot <br /> while not losing trees. The PWC also supported a two-way parking lot layout to maximize the total stall <br /> count. <br /> •December 13, 2022, Resolution#22-285, the Ramsey City Council ordered the City Engineer to prepare <br /> plans and specifications for Improvement Project#23-02, Central Park Main Parking Lot Reconstruction. <br /> •July 18,2023,the PWC recommended City Council approve plans and specifications and authorize an <br /> advertisement for bids for Central Park Main Parking Lot Reconstruction, Improvement Project#23-02. <br /> •July 25,2023,Resolution#23-166,the Ramsey City Council approved plans and specifications and <br /> authorized an advertisement for bids. <br /> •August 10,2023,the Park and Recreation Commission recommended City Council partially fund Central <br /> Park Main Parking Lot Reconstruction using Park Improvement Trust Funds. <br /> •October/November 2023,the concrete curbing, storm water infrastructure, and paving was completed, and <br /> readied for the planned-for planting and irrigation elements. <br /> •January 11 th, 2024,the Park&Recreation Commission recommends completion of the project by the <br /> addition of trees and irrigation at a not-to-exceed amount of$55,000 from the Park Trust Fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.