Laserfiche WebLink
5. 6. <br /> CC Regular Session <br /> Meeting Date: 02/13/2024 <br /> Primary Strategic Plan Initiative: Promote economic growth and development. <br /> Information <br /> Title: <br /> Authorize Preparation of Plans and Specifications and Advertisements for Bids for The Waterfront-Trails and <br /> Trees <br /> Purpose/Background: <br /> As part of the city's community park system, a water-centric park known as The Waterfront has been <br /> envisioned for more than a decade in Ramsey's downtown. This Fall,the mass grading for the park was completed <br /> and final seeding will occur in 2024. Last Winter,the Park&Recreation Commission performed a detailed <br /> analysis of how a park building could best serve the community this process resulted in a concept for an <br /> approximate 37,000 gross square foot two-story building, consisting of mass timber construction; and including <br /> dining, fitness, large indoor play area, gallery, and banquet space. The structure with proposed indoor and <br /> outdoor program areas is essentially a modern community center, with outdoor water-play elements replacing a <br /> traditional public swimming pool. <br /> The purpose of this case is to authorize staff to proceed to finalize plans and specifications for a trail construction <br /> project that would circumnavigate the 7+acre pond that is in place now. The capital improvement project would <br /> include the planting of 60 trees and the installation of benches and trash receptacles around the park. This case <br /> does not authorize the larger project in any way,but rather authorizes staff to complete the trail plans and obtain <br /> bids. <br /> The first attachment illustrates the scope of the proposed project this case authorizes. The last three attachments <br /> are planning concepts and included as background and for context. <br /> Notification: <br /> A Public Hearing was conducted in December 2023 on the city-wide Capital Improvement Plan, and park <br /> improvements in Ramsey's downtown were identified as a proposed 2024 project. <br /> Time Frame/Observations/Alternatives: <br /> Observations <br /> Note: separately within this agenda, Council is anticipated to Approve Plans and Authorizing Advertisements for <br /> Bids for Improvement Project#23-19, COR Infrastructure Improvements while the activity this case authorizes <br /> is similar in terms of process and location; the scope of work is quite different(trails and landscape versus streets <br /> and utilities), and also is to be funded via the Park Trust Fund(with no TIF funding whatsoever). <br /> Funding Source: <br /> This case does not authorize funding per se. The primary funding for the proposed trail and related elements <br /> would be from the Park Trust Fund, and would occur following a formal recommendation from the Park& <br /> Recreation Commission to City Council at a later date in 2024. <br /> Recommendation: <br />