My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/20/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:08 AM
Creation date
2/16/2024 2:40:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 1. <br />Public Works Committee <br />Meeting Date: 02/20/2024 <br />Primary Strategic Plan Initiative: Connect the community through Parks, Trails and Recreational Programming. <br />Title: <br />Consider Trail Connection between Bowers Drive and Riverstone South <br />Purpose/Background: <br />Purpose: <br />Consider construction of a public trail connecting Bowers Drive to the Riverstone South development as part of <br />the 2024 Bowers Drive pavement overlay project. <br />Background: <br />The City's 2024 to 2033 Capital Improvement Plan includes project #21-STR-012, 2024 Neighborhood Pavement <br />Overlays, which proposes pavement overlay improvements to various street segments in several neighborhoods <br />including Bowers Drive. Attached is the CIP project sheet for reference. <br />During project development Staff recalled previous City Council direction from their regular meeting on <br />September 8, 2020, when they reviewed the sketch plan for Riverstone South. During this meeting there was <br />consensus among Council that the City should not pursue a paved connection between Bowers Drive and <br />Riverstone South during the development process, but that the City maintain ownership of the outlots required to <br />make a connection and should reconsider a paved connection when an opportunity presents itself to do so. <br />Considering that a paving contractor will be on site in 2024, Staff wanted to take this opportunity to ask the <br />Public Works Committee for direction on this subject. Attached is a copy of City Council case #11229, an <br />attachment to that case showing the responses received from Bowers Drive residents to a survey asking whether <br />they supported a public road connection (not a trail), and the approved meeting minutes. <br />If a trail is to be constructed, Staff recommends a 10-foot wide bituminous trail able to support all necessary <br />maintenance equipment. The length of the trail is estimated to be 760 feet, which would be constructed through <br />two outlots and would connect Bowers Drive to the trail along the south side of Snowy Owl Street in Riverstone <br />South. <br />Attached is a copy of the Riverstone South plat, which shows Outlot F where the north half of the trail would be <br />constructed. <br />Also attached is a copy of the Pearson Place plat, which shows Outlot C where the south half of the trail would be <br />constructed. <br />Notification: <br />N/A <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff anticipates up to 30 minutes will be required to present and discuss this case and respond to questions. <br />Observations: <br />Vegetation in the outlots where a paved trail can be constructed have not been proactively maintained by the City <br />to date. The longer these outlots remain unimproved, the more costly it will become to construct improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.