My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/20/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 02/20/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:08 AM
Creation date
2/16/2024 2:40:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
would be mobile work. He commented that there will be an increase in truck traffic during hauling <br />of material. <br />City Engineer/Public Works Director Westby commented that this would be similar to the 167th <br />Avenue reconstruction project completed last year. <br />Assistant City Engineer Feriancek commented that there may be times where there are short term <br />closures. <br />Motion by Councilmember Howell, seconded by Councilmember Musgrove, to recommend City <br />Council approval of plans and specifications and authorizing advertisement for bids for MSA <br />Alpine Drive Reconstruction, Improvement Project #24-11. <br />Motion carried. Voting Yes: Chairperson Musgrove and Councilmember Howell. Voting No: <br />None. Absent: Councilmember Olson. <br />5.06: Consider Recommending City Council Approval of Plans and Specifications and <br />Authorizing Advertisement for Bids for Juniper Woods 1st — 3rd Street <br />Reconstructions, Improvement Project #24-12 <br />Assistant City Engineer Feriancek reviewed the staff report and recommendation for the City <br />Council to approve plans and specifications and authorize advertisement for bids for Juniper <br />Woods 1st — 3rd Street Reconstructions, Improvement Project #24-12. <br />Chairperson Musgrove asked if the median would remain. <br />Assistant City Engineer Feriancek replied that the median exists because of the power pole in the <br />middle and the large cost to relocate that power pole, therefore they proposed to leave that in place. <br />He stated that the curb would be replaced and filled with concrete rather than leaving greenspace. <br />Chairperson Musgrove asked if there would be spot curb replacements as some of the roads have <br />curb and gutter. <br />Assistant City Engineer Feriancek commented that the curb and gutter that exists is in fairly good <br />condition and therefore they will be doing spot replacements. <br />Chairperson Musgrove commented that it seems that the cost is high to reclaim the trail. <br />Assistant City Engineer Feriancek replied that these are estimated costs. He commented that in <br />square yard comparison a trail is more expensive than the street but believed the general cost to be <br />in line with typical pricing. <br />Motion by Councilmember Howell, seconded by Councilmember Musgrove, to recommend City <br />Council approval of plans and specifications and authorizing advertisement for bids for Juniper <br />Woods 1st — 3rd Street Reconstructions, Improvement Project #24-12. <br />Public Works Committee / January 16, 2024 <br />Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.