My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/26/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:09:15 AM
Creation date
2/23/2024 2:10:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
trunk watermain along 157 th lane from Potassium Street to Nowthen Boulevard as part of a trunk system loop. <br />This trunk watermain extension is proposed to occur as part of this project. <br />Proposed Improvements <br />Staff review of the geotechnical report found generally sandy subsoils, ideal for both roadway embankment and <br />utility support, throughout the project area. Because of this, subsoil corrections are not anticipated, and the <br />full -depth reclamation (FDR) design process will be used. <br />The alignments and profiles of the streets are proposed to generally match existing conditions. However, the <br />streets and centerlines tend to meander within the right-of-ways. This will cause the edges of pavement to move <br />several inches horizontally, and up to a foot vertically, from existing conditions. Additionally, the existing <br />roadway crown varies significantly throughout the project, with some areas having no crown or unanticipated <br />super elevation across the surface of the street. This project proposes to construct a crowned pavement section <br />with 3-percent cross slopes throughout, which has become typical practice for rural reconstructions in Ramsey. <br />The proposed section is 3.5-inches new bituminous pavement over 4-inches aggregate base. The aggregate base <br />will be made up of reclamation material. Driveway aprons will go back approximately 8 feet to tie the driveways <br />into the new pavement and materials are proposed to match existing. <br />In general, the current swales along the streets within Halls Dover Acres are not proposed to be re -graded as part <br />of this project. Staff is aware of standing water issues within the Radium Circle cul-de-sac, which are proposed to <br />be addressed. Additionally, the existing swale at the northwest quadrant of 157th Lane and Radium Street has <br />filled in over the years, completely covering the culvert. The soils are so well draining that water does not stand. <br />However, Staff must do grading work in the ditch for the new culvert to be properly installed. Otherwise, due to <br />the nature of street reconstruction, the in -slopes of the swales along the pavement will likely be disturbed <br />approximately 4 to 6 feet off the edge of pavement. No changes to the current drainage patterns are proposed. The <br />existing culverts crossing the streets are proposed to be removed and replaced. This is to ensure the culverts will <br />last at least through the proposed 60-year design life of the street. <br />A 12-inch trunk watermain is proposed to be extended from the existing end of line at Potassium Street, at the east <br />edge of the Halls Dover Acres plat, along 157th Lane to Nowthen Boulevard. From there, the watermain will <br />follow Nowthen Boulevard to Sunfish Lake Boulevard, and connect to an existing trunk watermain stub off of the <br />Sodium Way cul-de-sac. In total, the trunk watennain extension is approximately 2,100 lineal feet. Additionally, <br />an 8-inch watennain line is proposed to extend down the Radium Street stub to the south, to serve future <br />development to the south. Hydrants are proposed to be added at the corner of 157 th Lane and Nowthen <br />Boulevard, 157t11 Lane and Radiurn Street, and at the end of the stub on Radium Street. Because Halls Dover <br />Acres is not in the MUSA, the project does not propose to extend sanitary sewer to the subdivision. <br />During project design, Staff sent a letter to the properties along the trunk watermain route, inquiring if there is <br />interest in connecting to municipal water. No requests for connection were received. <br />Preliminary Schedule Remaininw <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o February 26, 2024 <br />• Contractor Begins Construction <br />o Spring 2024 <br />• Contractor Substantially Completes Construction <br />o Watermain construction in -place <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o August 2, 2024 <br />• Contractor Final Completion <br />o Watennain testing complete <br />o Verify final restoration; punch list created <br />o August 30, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.