Laserfiche WebLink
City Project 24-02 - Construction Staking <br />February 22, 2024 <br />Page 2 of 2 <br />• Additional services, if required, will be performed at the rates presented in the Proposed Fees <br />section of this proposal. <br />• In addition to the typical as -built items (such as hydrants, valves, manholes, catch basins), the <br />as -built survey allows for shooting newly installed curb stops. <br />PROPOSED FEES <br />Bolton & Menk proposes to perform the staking based on a not -to -exceed amount, based on the rates <br />presented in the following table: <br />Task and Personnel <br />Task 1: Construction Staking <br />Licensed Surveyor <br />Survey Technician <br />Survey Crew <br />Hours <br />10.0 <br />8.0 <br />116.0 <br />Rate/Hour Total <br />$189.00 <br />$160.00 <br />$189.00 <br />$ 1,890.00 <br />$ 1,280.00 <br />$21,924.00 <br />Subtotals 134.0 $25,094.00 <br />Task 2: Asbuilt Survey <br />Licensed Surveyor 2.0 $189.00 $ 378.00 <br />Survey Technician 1.0 $160.00 $ 160.00 <br />Survey Crew 8.0 $189.00 $ 1,512.00 <br />Subtotals 11.0 $ 2,050.00 <br />$27,144.00 <br />Grand Totals 145.0 <br />SCHEDULE <br />Due to our proximity to the site, we expect to be able to respond quickly to all construction staking <br />requests however 48-hour notice is required to allow us to efficiently schedule survey crews. <br />If there are any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Hups://boltonmenk-my.sharepoint.com.pmsonal/ke nki_boltommenk_com.Documents/Desktop. Ramsey 24-02 Staking, Ramsey 24-02 Staking Survey - Halls Dover Acres 02222024.docx <br />HUH) "4 Girn10 r: ii rr�ivl gil,.nn iiudPy r,rn�alr,; r;r <br />