My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #01-10-383 - 10/09/2001
Ramsey
>
Public
>
Resolutions
>
2001
>
Resolution - #01-10-383 - 10/09/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:26:18 AM
Creation date
3/6/2024 10:58:18 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#01-10-383
Document Date
10/09/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />RESOLUTION #01 -10 -383 <br />1653956 <br />Councilmember Hendriksen introduced the following resolution and moved for its adoption: <br />A RESOLUTION APPROVING THE ISSUANCE OF A CONDITIONAL USE PERMIT <br />FOR THE INSTALLATION AND OPERATION OF A CELLULAR ANTENNA <br />SYSTEM ON CITY OWNED PROPERTY AND DECLARING TERMS OF SAME <br />WHEREAS, Verizon Wireless has properly applied for a conditional use permit to install <br />and operate a cellular antenna system on the City Water Tower #2 on City owned property <br />legally described as follows: <br />Outlot B, AEC ENERGY PARK, ANOKA COUNTY, MINNESOTA <br />( "Site ") <br />WHEREAS, the Planning Commission met on August 7, 2001, conducted the public <br />hearing and recommended City Council approval of the request. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE <br />CITY OF RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br />1. Based on Findings of Fact #0579, a conditional use permit (Permit) for the installation <br />and operation of a cellular antenna system located on the City Water Tower #2 on City <br />owned property is hereby granted to Verizon Wireless, hereinafter referred to as <br />"Permittee ". <br />2. This Permit shall remain in effect until August 31, 2026 as long as the conditions <br />imposed herein are complied with and so long as the Permittee, as Lessee has a valid <br />Lease in place with the City as Lessor for lease of the necessary property on the City's <br />water tower and related mezzanine area for the operation of its equipment on the site. <br />However, the Permittee shall have the option for a maximum of four (4) 5 -year renewals, <br />resulting in a total permit period of up to twenty -five (25) years. The Permittee shall be <br />responsible for submitting a written request for permit renewal at least 30 days prior to <br />expiration of the permit. Said written request shall be submitted to City Council for <br />review and consideration. <br />3. All cellular equipment structures will be located inside the water tower on the ground <br />floor and will be encompassed with security fence. Construction and construction <br />methods of all equipment structures within the water tower shall be subject to the review <br />and approval of the City Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.