Laserfiche WebLink
/�1GNE C O N S T R U C T IO N Proposal <br /> I► Y <br /> COMMERCIAL 6 INDUSTRIAL CONTRACTORS <br /> 1401 Park Road Chanhassen, MN 55317 <br /> www.magneyconstruCtion.Com 952.474.1674 Office 952.474.1679 FAX <br /> SEND TO <br /> Company name From <br /> AE2S Kevin Vranicar <br /> Attention Date <br /> Mr. Ryan Hanson 12/5/2023 <br /> E-mail Phone Magney Proposal# 010 <br /> Rvan.Hanson(a�ae2s.com (612)220-0154 RFP No.007 Backwash Supply Piping <br /> F] Urgent � Please comment X� Please review � For your information <br /> Total pages,including cover: 2 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant - Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br /> material, and equipment to complete the backwash supply piping modifications, as requested in RFP 007, <br /> dated 10/20/23. The requested changes also impact the originally drawn piping lengths and configurations, <br /> but this will not impact the overall costs for those modifications. The costs associated with this change are <br /> summarized below. <br /> Labor: Installation of one (1) additional 16" 90 Degree Bend $ 652.50 <br /> Material: Core & Main (including sales tax) (see attached) $ 1,820.00 <br /> Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 65.25 <br /> Subcontractor: Fresh Blast Painting (paint additional fitting) $ 100.00 <br /> Subtotal $ 2,637.75 <br /> General Contractor's Overhead $ 385.66 <br /> Bond & Insurance premiums $ 45.35 <br /> Lump Sum Total: $ 37068.77 <br /> Additional Calendar Days Required for this Change (Including material lead time): 0.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> l/ <br /> Kevin Vranicar <br /> Vice President Accepted By Date <br /> Page 1 of 1 <br />