My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14t?j n S <br /> Request For Proposal No. 007 <br /> Date of Issuance: 10/20/2023 <br /> Project Manager: Aaron Vollmer, P.E. <br /> AE2S <br /> Water Tower Place Ste 184 <br /> 6901 E. Fish Lake Road <br /> Maple Grove, MN 55369 <br /> Contractor: Magney Construction Inc. <br /> Project: Ramsey Water Treatment Plant <br /> Owner: City of Ramsey, Minnesota <br /> Re: Backwash Supply Piping <br /> Please submit a cost proposal for changes to the Contract Documents for the following <br /> proposed modifications. THIS IS NOT A WORK CHANGE DIRECTIVE, CHANGE <br /> ORDER, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE <br /> PROPOSED MODIFICATIONS. <br /> Description: <br /> AE2S requests pricing from Magney for the cost to add a 16" spool piece to the <br /> backwash supply piping at 88.67' and shift the backwash supply piping connection <br /> overhead (110-00') to the east to avoid a conflicting steel support beam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.