Laserfiche WebLink
Erickson Electric <br /> Material Cost <br /> Material $ 774.46 <br /> Tax 7.625% $ 59.05 <br /> Material MU 10% $ 77.45 <br /> Permit $ - <br /> Labor Rate/hr Hours <br /> PM/Estimator $170 1 $ 170.00 <br /> Wireman $160 26.78 $ 47284.80 <br /> Overtime 1-1/2 $240 0 $ - <br /> Overtime double time $320 0 $ - <br /> Labor MU 10% $ 445.48 <br /> Subcontractor <br /> Labor/Mat. $ 880.00 <br /> Markup @ 5% $ 44.00 <br /> Subtotal $ 6)735.24 <br /> Bond $ - <br /> Total cost for this chance $ 61735.24 <br />