My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/�1GNE C O N S T R U C T IO N Proposal <br /> I► Y <br /> COMMERCIAL 6 INDUSTRIAL CONTRACTORS <br /> 1401 Park Road Chanhassen, MN 55317 <br /> www.magneyconstruCtion.Com 952.474.1674 Office 952.474.1679 FAX <br /> SEND TO <br /> Company name From <br /> AE2S Noah Pundsack <br /> Attention Date <br /> Mr. Ryan Hanson 1/24/2024 <br /> E-mail Phone Magney Proposal# 013 <br /> Rvan.HansonCab-ae2s.com (612)220-0154 RFP 008 - Jet Mixing System Pump Modifications <br /> F] <br /> Urgent F] Please comment X Please review � For your information <br /> Total pages,including cover: 3 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant - Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to provide the necessary labor, <br /> material and equipment to furnish the alternative, Schurco end suction pumps, as requested in RFP 008 - Jet <br /> Mixing System Pump Modifications. Please note that the change in pumps will require a different floor <br /> sleeve, due to variations in pump the centerlines. Please also recall that a $25,000 lump sum credit was <br /> previously provided and accepted as part of Magney Proposal 001 - Jet Mixing Piping Modifications. The <br /> costs associated with this change are summarized below. <br /> Labor: $ - <br /> Material: Treatment Resources Inc. (see attached) $ 15,000.00 <br /> Material: Required Modified Floor Pipe - Core & Main (see attached) $ 1,571.50 <br /> Equipment: $ - <br /> Subcontractor: $ - <br /> Subtotal $ 165571.50 <br /> General Contractor's Overhead $ 235.73 <br /> Bond & Insurance premiums $ 27.11 <br /> Lump Sum Total: $ 167834.33 <br /> Additional Calendar Days Required for this Change (Including material lead time): 0.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> NoAs Pt4md9ac4 <br /> Noah Pundsack <br /> Project Engineer Accepted By Date <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.