Laserfiche WebLink
AGN� C O N S T R U C T IO N Proposal <br /> r� COMMERCIAL 5 INDUSTRIAL CONTRACTORS <br /> 1401 Park Road - Chanhassen, MN 55317 <br /> www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br /> SEND TO <br /> Company name From <br /> AE2S Noah Pundsack <br /> Attention Date <br /> Mr. Ryan Hanson 1/26/2024 <br /> E-mail Phone Magney Proposal#014 <br /> Ryan.Hanson ae2s.com (612)220-0154 RFP 009 - Backwash Overflow Modifications <br /> F1Urgent F1 Please comment Fx Please review � For your information <br /> Total pages,including cover. 2 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant- Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br /> material, and equipment to complete abortion of the requested changes in RFP 009- Backwash Overflow <br /> Modifications. This proposal will cover extending the depth of one overflow weir and lower the invert of the <br /> overflow pipe to 102.5' Please see the attached documentation from Metro Manufacturing, which includes <br /> additional information pertaining to their proposed scope of work. Please see our separate correspondence <br /> regarding the wall sleeves. The costs associated with this change are summarized below. <br /> Labor: Installation of Additional Anchors and Larger Weir Box $ 285.93 <br /> Material: Metro Manufacturing (see attached) $ 1,000.00 <br /> Equipment: Misc. Small Tools and Equipment(10% of Labor) $ 28.59 <br /> Subcontractor: <br /> Subtotal $ 17314.52 <br /> General Contractor's Overhead $ 197.18 <br /> Bond & Insurance premiums $ 22.68 <br /> Lump Sum Total: $ 19534.38 <br /> Additional Calendar Days Required for this Change (Including material lead time): 0.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> NoA/i Pandgac4 <br /> Noah Pundsack <br /> Project Engineer Accepted By Date <br /> Page 1 of 772 <br />