Laserfiche WebLink
J I-) E2S <br /> Request For Proposal No. 009 <br /> Date of Issuance: 1/11/2024 <br /> Project Manager: Aaron Vollmer, P.E. <br /> AE2S <br /> Water Tower Place Ste 184 <br /> 6901 E. Fish Lake Road <br /> Maple Grove, MN 55369 <br /> Contractor: Magney Construction Inc. <br /> Project: Ramsey Water Treatment Plant <br /> Owner: City of Ramsey, Minnesota <br /> Re: Backwash Tank Overflow <br /> Please submit a cost proposal for changes to the Contract Documents for the following <br /> proposed modifications. THIS IS NOT A WORK CHANGE DIRECTIVE, CHANGE <br /> ORDER, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE <br /> PROPOSED MODIFICATIONS. <br /> Description: <br /> AE2S requests pricing from Magney to increase the depth of the weir box in the <br /> backwash tank to 48" and lower the invert of the 20" overflow pipe to 102.5'. We also <br /> request pricing from changing the FLxMJ to a FLxPE in the backwash tank, clearwell, <br /> Filter 3, and Filter 4. See attached for any additional changes required. Review <br /> comments from Submittal 132 — Overflow—Weir Boxes, and include any changes <br /> required with this proposal. <br />