My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�1GN� CONS TR U CT I ON Proposal <br /> COMMFRrIA1. FT NnilqTRW rONTRArTnh:3 <br /> 1401 Park Road Chanhassen, MN 55317 <br /> www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br /> SEND TO <br /> Company name From <br /> AE2S Noah Pundsack <br /> Attention Date <br /> Mr. Ryan Hanson 2/26/2024 <br /> E-mail Phone Magney Proposal#015 <br /> Rvan.Hanson(@-ae2s.com (612)220-0154 Field Order No. 04 - Door Hardware ASI <br /> F] Urgent F] Please comment Fx] Please review For your information <br /> Total pages,including cover: 3 <br /> COMMENTS <br /> Re: Ramsey Water Treatment Plant - Ramsey, MN <br /> Ryan, <br /> Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, material, <br /> and equipment to complete the requested changes/ supplemental instructions referenced in AE2S'/Design <br /> Tree's Field Order No. 4 -ASI Door Hardware Changes. Please see attached documentation/proposal from Mid <br /> Central Door Co., which includes additional information pertaining to their proposed scope of work. The costs <br /> associated with this change are summarized below. <br /> Labor: $ 3,955.68 <br /> Material: Consumable tools ( Drill Bits & Taps ) $ 710.40 <br /> Material: Mid Central Door CO. (see attached) $ 4,295.77 <br /> Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 395.57 <br /> Subcontractor: <br /> Subtotal $ 97357.42 <br /> General Contractor's Overhead $ 17403.61 <br /> Bond & Insurance premiums $ 161.42 <br /> Lump Sum Total: $ 1 0,922.45 <br /> Additional Calendar Days Required for this Change (Including material lead time): 0.0 <br /> Please review this proposal and feel free to contact me with any questions, comments or concerns. <br /> Thank you, <br /> NoAli PaNdsAc4 <br /> Noah Pundsack <br /> Project Engineer Accepted By Date <br /> Page 1 of 772 <br />
The URL can be used to link to this page
Your browser does not support the video tag.