My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 08 71 00 _ ASI-001 <br /> DOOR HARDWARE <br /> PART 1 - GENERAL <br /> 1.1 CONDITIONS <br /> A. Conditions of the contract (General and Supplementary Conditions) and Division One General <br /> Requirements, govern the work of this section. <br /> B. This section includes all material and related service necessary to furnish all finish hardware <br /> indicated on the drawings or specified herein. <br /> C. Furnish UL listed hardware for all labeled and 20 min. openings in conformance with the <br /> requirements for the class of opening scheduled. UL requirements shall have precedence over <br /> specification where conflicts exist. <br /> D. All work shall be in accordance with all applicable state and local building codes. Code <br /> requirements shall have precedence over this specification where conflicts exist. <br /> 1.2 WORK INCLUDED <br /> A. This section includes the following: <br /> 1. Finish door hardware for hollow metal, wood and aluminum doors specified herein, listed in <br /> the hardware schedule, and/or required by the drawings. <br /> 2. Thresholds and Weather-stripping (Aluminum frame seals to be provided by aluminum door <br /> supplier) <br /> 3. Electro-Mechanical Devices <br /> 4. Access Control components and or systems specified within this section. <br /> B. Where items of hardware are not definitely or correctly specified and is required for the intended <br /> service, such omission, error or other discrepancy should be directed to the Architect prior to the <br /> bid date for clarification by addendum. Otherwise furnish such items in the type and quantity <br /> established by this specification for the appropriate service intended. <br /> 1.3 RELATED WORK IN OTHER SECTIONS <br /> A. This section includes coordination with related work in the following sections: <br /> 1. Division 6 Section "Finish Carpentry". <br /> 2. Division 8 Section "Hollow Metal Doors and Frames". <br /> 3. Division 8 Section "Wood Doors" <br /> 4. Division 8 Section "Aluminum Entrances and Storefronts" <br /> 5. Division 28 Sections "Electrical". <br /> 1.4 REFERENCES <br /> A. Publications of agencies and organizations listed below form a part of this specification section <br /> to the extent referenced. <br /> 1. DHI - Recommended Locations for Builders' Hardware. <br /> 2. NFPA 80- Standards for Fire Doors and Windows. <br /> 3. NFPA 101 - Code for Safety to Life from Fire in Buildings and Structures. <br /> 4. UL- Building Material Directory. <br /> 5. DHI - Door and Hardware Institute <br /> 6. WH I - Warnock Hersey <br /> 7. BHMA- Builders Hardware Manufacturers Association <br /> 8. ANSI —American National Standards Institute <br /> 9. IBC 2012- International Building Code 2012 Edition (as amended by local building code) <br /> 1.5 SUBMITTALS <br /> A. Within ten days after award of contract, submit detailed hardware schedule in quantities as <br /> required by Division 1 - General Conditions. <br /> Ramsey Water Treatment Plant 0871 00 - 1 DOOR HARDWARE <br /> Ramsey, Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.