Laserfiche WebLink
Erickson Electric <br /> Material Cost <br /> Material $ 17185.00 <br /> Tax 7.625% $ 90.36 <br /> Material MU 10% $ 118.50 <br /> Permit $ - <br /> Labor Rate/hr Hours <br /> PM/Estimator $170 1 $ 170.00 <br /> Wireman $160 26 $ 47160.00 <br /> Overtime 1-1/2 $240 0 $ - <br /> Overtime double time $320 0 $ - <br /> Labor MU 10% $ 433.00 <br /> Subcontractor <br /> Labor/Mat. <br /> Markup @ 5% $ - <br /> Subtotal $ 6,156.86 <br /> Bond $ - <br /> Total cost for this change $ 61156.86 <br />