My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON 7533 Sunwood Drive N <br /> Suite 206 <br /> ,k MENK Ramsey, MN 55303-5119 <br /> Real People. Real Solutions. Ph: (763) 433-2851 <br /> Fax: (763) 427-0833 <br /> Bolton-Menk.com <br /> March 5, 2024 <br /> Joe Feriancek, P.E. <br /> Assistant City Engineer <br /> 7550 Sunwood Drive NW <br /> Ramsey, MN 55303 <br /> RE: Proposal for Construction Staking Services, City of Ramsey—Juniper Woods 1st—3rd Street <br /> Reconstructions (City Project No. 24-12) <br /> Dear Mr. Feriancek: <br /> We appreciate the opportunity to assist the City of Ramsey with construction staking for the above <br /> referenced project. <br /> SCOPE OF WORK <br /> Bolton & Menk will complete the construction survey for the project. Per the plans, this project includes <br /> approximately 0.75 miles of street reclamation and trail reclamation. Staking generally includes: <br /> • 300 LF of Class 5 Aggregate Base Course staking (Waco Street between 150th Ave & 150th Ln), <br /> • Potentially staking centerline prior to paving, <br /> • Ute Street intersection, <br /> o Approximately 200 LF of curb and gutter between the median and curb returns <br /> o Valley gutter across Ute Street, <br /> o Concrete median with bull noses, and <br /> o Pedestrian ramp. <br /> • One storm sewer structure and 32 LF of pipe, <br /> • Subbase and Class 5 Aggregate Base Course for Approximately 100 LF of Bituminous Trail (along <br /> Alpine Drive) <br /> o We understand that most of the bituminous trail will be reclaimed, compacted in-place, <br /> and paved, and therefor shouldn't need staking, <br /> • 3 Pedestrian Ramps, and <br /> • Miscellaneous other staking as requested by the City. <br /> We will also complete the As-built Survey for Record Drawing creation. <br /> ASSUMPTIONS <br /> We have made the following assumptions in preparing this proposal: <br /> • No allowance is included for staking of removals, clearing, or right-of-way. <br /> • Replacing damaged or removed stakes is not included in our base fee. <br /> Https://boltonmenk-my.sharepoint.com/personal/kevinki_bolton-menk com/Documents/Desktop/Ramsey 24-12 Staking/Ramsey 24-12 Staking Survey-Juniper Woods 03052024.docx <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.