My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 03/14/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 03/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:35:01 AM
Creation date
3/18/2024 8:39:45 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
03/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Illustration of spacer beam <br /> mm <br /> ru <br /> wrvu ,m <br /> u. <br /> f <br /> i: <br /> 1 <br /> 1 o, <br /> Treated spacer beam to consist of 4 x 4 blocks +/-5" high, placed 2' o.c. Treated 2 x 4 <br /> joint(s) to be centered over blocks—however, top and bottom 2 x 4 joints to alternate <br /> when possible. <br /> Spacer beams shall be placed on the existing edges of the 6' boardwalk, and a third down <br /> the center. The spacer beam shall be 8" in total height, and may be greater in areas if <br /> needed to level for the new decking, and less for the north 30' of the boardwalk. Shims <br /> to account for undulation in the surface of the existing boardwalk, shall be placed cinder <br /> the spacer beam such that the new S' decking shall be uniformly flat and screwed to the <br /> continuous new treated material of the top of the spacer beam. <br /> 6 1 F";0 �',„ C, <br />
The URL can be used to link to this page
Your browser does not support the video tag.