My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br /> Background + Purpose <br /> Overview Outcomes+ Deliverables <br /> The purpose of the Center StreetArea Framework+ Policy Plan is to advance the planning As indicated,the above project listing is <br /> activity for several interrelated projects within this district.Several of these project have <br /> timelines that require the work to commence as soon as possible.Asummary list of current merely a summary outline of the work to be <br /> performed;the detailed Scope of Services <br /> and potential future projects includes: <br /> • Center Street sidewalk(s)in front of the Sapphire building; (provided by the Consultant Team),will <br /> • Center Street streetscape/trail(west side)near the interface of the Affinity and Municipal result in design guidelines to allow the city <br /> Plaza; to develop specifications(cross-sections <br /> • Municipal Plaza(north)at the interface with Affinity; with details)such that quotations may be <br /> • Municipal Plaza(south)the larger Happy Days site; sought for work that must be completed <br /> • Pump House Plaza the area immediately surrounding the small Pump House No.#3; like the sidewalk/streetscape adjoining the <br /> • Pump House Exterior potential facade improvements; <br /> • 145th Avenue sidewalk connecting to Center Street. Sapphire building. Additionally,the scope <br /> and cost of other features may be better <br /> understood and accordingly,will result in <br /> the ability to proceed with improvements to <br /> Municipal Plaza,and the Pump House site <br /> (plaza,concrete landscaping and conceiv- <br /> ably an attached public restroom),at such <br /> time it is authorized b City Council in <br /> Y y ,C <br /> 2020or2021). <br /> Further,the above referenced Scope of <br /> Services will develop the design for the <br /> Pump House facade and related <br /> architectural treatments,and result in a <br /> �! Design-build RFP that will provide City <br /> a Council with the cost and contractor(upon <br /> 1UJD1MD, approval)that can complete the 2020 <br /> Capital Improvement Project for Municipal <br /> i <br /> Pump House#3. <br /> / <br /> a r <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.