Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br /> 7vi ar/il ' <br /> w° �J <br /> R place xisting <br /> r ' , toonatw c rb <br /> a gutter, storm- , <br /> Parallel parking U w er catch rnen, <br /> d <br /> (both sides) �;' basins and other <br /> Oro 'osed irnprove- <br /> �W <br /> r-cents in this area., <br /> i Stormwater Keep existing cUfb/ <br /> .� catchment gutter,concrete <br /> basins "walk/Regional Trail <br /> and street,pave- <br /> �,� ent in this area, <br /> WE <br /> 41 <br /> ., <br /> V" <br /> 'j Center Streets ,,V <br /> Concept Plan , <br /> r,, J <br /> T1J <br /> Regional Stormwater Catchment Parallel 10'Wide <br /> Trail Basin(both sides) Parking Bay(both Concrete Walk <br /> sides) <br /> Center Street It's importantto note however,that this <br /> P R O J E C T D E S C R I P T I O N document also presents a somewhat <br /> cautious approach,seeking to minimize <br /> The primary purpose of the Conceptual Site Plan for Center Street is to illustrate how this key disruption to existing Center Street im- <br /> north/south connector ties together all the other pieces of this Framework+ Policy Plan. provements.The basic objective is to work <br /> At the same time,it also promotes various opportunities for innovative district infrastructure with existing curb lines,parking bays and <br /> as an integral part of current and proposed street,park,trail and private development other pavement dimensions as the starting <br /> project design-suggesting shared systems for stormwater capture/reuse,energy point for completing street construction to <br /> production/distribution,waste handling/recycling and other technologies. Ramsey Parkway and northward to Bunker <br /> Lake Boulevard.(Also refer to the Sapphire <br /> Apartments Frontage and Central Anoka <br /> County Regional Trail information in this Plan) <br /> 23 <br />