Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br /> Future Development Site Frontage Riroj e ,:I-1 51e irl e n lltnH. <br /> Stormwater catchment basins will be connected to existing <br /> storm sewer located in Center Street-future phases will route <br /> al Plaza for� <br /> this water to underground cisterns in Municipal g p <br /> irrigation and other re-use purposes. <br /> 10' Concrete Walk <br /> � ail <br /> g// <br /> //l; Any', <br /> t <br /> Stormwater <br /> Catchment Basin- v„ <br /> width to match depth <br /> of parking bay <br /> l 14 � `n luulliri� � � II <br /> i <br /> vey / u, <br /> / 1� <br /> l i <br /> B-Type Curb <br /> with Curb cuts <br /> to Allow Water <br /> Inflow <br /> b pryp� I <br /> h <br /> µr�u� <br /> Center Stormwater 10 wide Private Plaza <br /> Street Catchment Basin Concrete Walk for Public Use <br /> 32 <br />