Laserfiche WebLink
Probable Construction Costs <br /> Municipal Plaza-South <br /> TOTAL <br /> ESTIMATED UNIT TOTAL <br /> DIVISION DESCRIPTION QUANTITY UNITS COST COST <br /> GENERAL REQUIREMENTS $ 48,000 <br /> MOBILIZATION(3%) 1 LUMP $ 48,000.00 $ 48,000 <br /> EARTHWORK $ 53,714 <br /> COMMON EXCAVATION 959 CU YD $ 20.00 $ 19,187 <br /> SLOPE PROTECTION 213 SQ YD $ 8.50 $ 1,812 <br /> SELECT GRANULAR BORROW AND ROUGH GRADING 959 CU YD $ 25.00 $ 23,983 <br /> TOPSOIL BORROW AND ARCHITECTURAL GRADING 291 CU YD $ 30.00 $ 8,732 <br /> CONCRETE WALKS AND STREET $ 223,853 <br /> CURB AND GUTTER LF $ 18.00 $ - <br /> DETECTABLE CURB RAMPS EA $ 1,500.00 $ - <br /> 4"CONCRETE WALK 23 200 SF $ 6.00 $ 139,200 <br /> BITUMINOUS TRAILS LF $ 4.00 $ - <br /> PERVIOUSPAVERS(INCLBASE) 2470 SF $ 30.00 $ 74,100 <br /> BITUMINOUS WEAR COURSE(2") TON $ 100.00 $ - <br /> BITUMINOUS NON-WEAR COURSE(2") TON $ 90.00 $ - <br /> AGGREGATE BASE 480 CY $ 22.00 $ 10,553 <br /> FOUNTAINS $ 310,000 <br /> RIBBON 1 LUMP $ 60,000.00 $ 60,000 <br /> STEPS(INCLUDES CONCRETE STEPS,MECHANICAL,FINISHES) 1 LUMP $ 250,000.00 $ 250,000 <br /> ARCHITECTURE <br /> SF $ - <br /> STAIRS AND WALLS $ 225,630 <br /> 6"RISERS 232 SF $ 90.00 $ 20,880 <br /> 12"H SEAT WALLS(+18"buried) 1 353 LF $ 150.00 $ 202,950 <br /> RAILINGS 24 LF $ 75.00 $ 1,800 <br /> FENCE/SCREEN $ 30,000 <br /> DECORATIVE FENCE 300 LF $ 100.00 $ 30,000 <br /> FURNISHING $ 71,100 <br /> KIOSK(ARTFUL STRUCTURE, PART(SIGN AND INTERPRETIVE SIGN) 1 EA $ 15,000.00 $ 15,000 <br /> RECEPTACLES 6 EA $ 1,500.00 $ 9,000 <br /> BENCHES 6 EA $ 2,500.00 $ 15,000 <br /> BIKE RACKS 1 EA $ 1,500.00 $ 1,500 <br /> FIRE TABLE 4 EA $ 3,000.00 $ 12,000 <br /> DRINKING FOUNTAIN EA $ 5,000.00 $ - <br /> PICNICTABLES 1 EA $ 3,000.00 $ 3,000 <br /> TREE GRATE 13 EA $ 1,200.00 $ 15,600 <br /> PLAY EQUIPMENT? EA $ 50,000.00 $ - <br /> LIGHTING $ 68,400 <br /> PEDESTRIAN POLE LIGHTS 38 EA $ 1,800.00 $ 63,400 <br /> STORMWATER RE-USE AND TREATEMENT $ 299,000 <br /> COLLECTION,CLEAN AND REUSE 1.3 ACRE $ 230,000.00 $ 299,000 <br /> GENERAL PLANTING $ 265,128 <br /> TREES 33 EA 500.00 16,500.00 <br /> SM TREES 27 EA 400.00 10,800.00 <br /> PLANTING SOIL 1200 CY 30.00 36,000.00 <br /> PERENNIALS/SHRUBS 15485 SF 8.00 123,880.00 <br /> NATIVE SEEDING W/PLUGS 0 ACRE 5000.00 - <br /> SOD 2266 SY 8.00 18,128.00 <br /> IRRIGATION 32700 SF 1.00 32,700.00 <br /> ALUMINUM EDGING 1240 LF 8.00 9,920.00 <br /> MULCH W FABRIC 1720 SY 10.00 17,200.00 <br /> UTILITIES <br /> STORM,WATER,POWER 1 LUMP $50,000.00 $ 50,000 <br /> ESTIMATED CONSTRUCTION COSTS $ 1,644,824 <br /> 10%DESIGN CONTINGENCY 10% $ 164,500 <br /> ESTIMATED CONSTRUCTION COSTS $ 1,809,324 <br />