Laserfiche WebLink
Probable Construction Costs <br /> Waterfront Park-Outer Area <br /> TOTAL <br /> ESTIMATED UNIT TOTAL <br /> DIVISION DESCRIPTION QUANTITY UNITS COST COST <br /> GENERAL REQUIREMENTS $ 33,000 <br /> MOBILIZATION(3%) 1 LUMP $ 33,000.00 $ 33,000 <br /> EARTHWORK $ 157,433 <br /> COMMON EXCAVATION 3 255 CU YD $ 20.00 $ 65,102 <br /> SLOPE PROTECTION 723 SQ YD $ 8.50 $ 6,148 <br /> SELECT GRANULAR BORROW AND ROUGH GRADING 3 255 CU YD $ 25.00 $ 81,378 <br /> TOPSOIL BORROW AND ARCHITECTURAL GRADING 160.185185 CU YD $ 30.00 $ 4,806 <br /> CONCRETE WALKS AND STREET $ 237,671 <br /> DETECTABLE CURB RAMPS 9 EA $ 1,500.00 $ 13,500 <br /> 4"CONCRETE WALK 15 200 SF $ 6.00 $ 91,200 <br /> BITUMINOUS TRAILS 4543 LF $ 4.00 $ 18,172 <br /> AGGREGATE BASE 955 Cy $ 22.00 $ 20,999 <br /> BOARDWALKS/DOCK 1340 LF $ 70.00 $ 93,800 <br /> FOUNTAINS <br /> ARCHITECTURE <br /> STAIRS AND WALLS $ - <br /> FENCE/SCREEN $ - <br /> FURNISHING $ 113,000 <br /> KIOSK(ARTFUL STRUCTURE, PART(SIGN AND INTERPRETIVE SIGN) 2 EA $ 15,000.00 $ 30,000 <br /> RECEPTACLES 8 EA $ 1,500.00 $ 12,000 <br /> BENCHES 12 EA $ 2,500.00 $ 30,000 <br /> BIKE RACKS 4 EA $ 1,500.00 $ 6,000 <br /> DRINKING FOUNTAIN 1 EA $ 5,000.00 $ 5,000 <br /> PICNICTABLES 10 EA $ 3,000.00 $ 30,000 <br /> PLAY EQUIPMENT EA $ 50,000.00 $ - <br /> LIGHTING $ 216,000 <br /> PEDESTRIAN POLE LIGHTS 120 EA $ 1,800.00 $ 216,000 <br /> STORMWATER RE-USE AND TREATEMENT $ - <br /> GENERAL PLANTING $ 524,961 <br /> TREES 100 EA 500.00 50,000.00 <br /> SM TREES 0 EA 400.00 - <br /> PLANTING SOIL 5333 CY 30.00 159,990.00 <br /> PERENNIALS/SHRUBS 8650 SF 8.00 69,200.00 <br /> NATIVE SEEDING W/PLUGS 1.7 ACRE 5000.00 8,500.00 <br /> KAME&DRUMLIN AREA NATIVE SEEDING W/PLUGS 0.7 ACRE 5000.00 3,500.00 <br /> KAME&DRUMLIN SOD 6350.0 SY 8.00 50,800.00 <br /> SOD 1265 SY 8.00 10,120.00 <br /> IRRIGATION 86351 SF 1.00 86,351.00 <br /> ALUMINUM EDGING 0 LF 8.00 - <br /> MULCH W FABRIC 8650 SY 10.00 86,500.00 <br /> UTILITIES <br /> STORM,WATER,POWER 1 LUMP $50,000.00 $ 50,000 <br /> ESTIMATED CONSTRUCTION COSTS $ 1,332,066 <br /> 10%DESIGN CONTINGENCY 10% $ 133,300 <br /> ESTIMATED CONSTRUCTION COSTS $ 1,465,366 <br />