My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01 <br /> BOLTON <br /> D & MEINK <br /> Real Pill Real siolutions. <br /> MEMORANDUM <br /> Date: February 19, 2018 <br /> To: Mr. Patrick Brama, Economic Development Manager <br /> Mr. Time Gladhilt, Community Development Director <br /> Mr. Bruce Wetsby, City Engineer <br /> From: Kevin P. Kielb, P.E. <br /> Subject: Ramsey Parkway Center Median Analysis <br /> City of Ramsey <br /> Introduction <br /> The City of Ramsey is reviewing the potential for revising the proposed design of the Ramsey Parkway <br /> center median between Center Street and Zeolite Street. The median is currently proposed as a raised, <br /> vegetated median with trees, shrubs and grasses. The total length of median area,not including the paved <br /> intersections, is approximately 1,565 feet. The area analyzed is depicted on Figure 1. <br /> The City is exploring the potential of creating a depressed median design, with stormwater directed to the <br /> median from the travel lanes of Ramsey Parkway. <br /> Based on recent conversations with City staff,infiltration is not allowed within The COR area. Depressed <br /> medians will need to be designed as filtration systems,rather than infiltration systems. This adds <br /> significantly to project costs when compared to a typical depressed, vegetated median. <br /> Recommendations <br /> The median areas through the COR are located in the moderate vulnerability Drinking Water Supply <br /> Management Area. Groundwater protection will be required if the medians are depressed. <br /> A table was prepared depicting estimated project costs associated with the various alternatives reviewed. <br /> Either woven geotextile liner, clay liner, or EPDM rubber liner could be used for lining the median area. <br /> The City should consider the benefits and costs for the various options when deciding which option to <br /> select. <br /> Design Considerations <br /> Construction stormwater best management practices (BMPs)in the median areas include directing <br /> stormwater runoff volume from the street into the median through curb cuts or pipe and depressing the <br /> ?.� Z� <br /> median area to create stormwater capture volume. Additional infrastructure is necessary to keep soils dry <br /> (i.e.perforated tile) and/or overflow structures to capture and discharge flood level flows. <br /> The majority of the COR is in the Moderate Vulnerability drinking water supply management area, with <br /> certain sections within the Emergency Response Area. Based on conversations with the City, these areas <br /> C:\Users\kevinki\Desktop\RaniseyMedian\Ttic COR-Center Median Menlo 02162018.docx <br /> NIN IN li!III I <br />
The URL can be used to link to this page
Your browser does not support the video tag.