My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bolton & Menk, Inc. <br /> Proposal QTB175606 <br /> April 4, 2023 <br /> Page 6 <br /> We will determine the actual laboratory testing for the project depending on the encountered <br /> subsurface conditions. If we identify a laboratory testing program that exceeds the budget included in <br /> this proposal but provides additional value to the project, we will request authorization for the additional <br /> fees through a Change Order. <br /> Engineering Analyses <br /> We will use data obtained from the subsurface exploration and laboratory tests to evaluate the <br /> subsurface profile and groundwater conditions, and to perform engineering analyses related to structure <br /> and pavement design and performance. <br /> Geotechnical Report <br /> We will prepare a report including: <br /> ■ A sketch showing the exploration locations. <br /> ■ Logs of the borings describing the materials encountered and presenting the results of our <br /> groundwater measurements and laboratory tests. <br /> ■ A summary of the subsurface profile and groundwater conditions. <br /> ■ Discussion identifying the subsurface conditions that will impact design and construction. <br /> ■ Discussion regarding the reuse of on-site materials during construction. <br /> ■ Recommendations for preparing structure and pavement subgrades, and the selection, <br /> placement and compaction of fill. <br /> ■ Recommendations of structure bearing capacities and assumed R-value for use in pavement <br /> section design. <br /> ■ Recommendations for the design and construction of pavements and stormwater <br /> improvements. <br /> We will only submit an electronic copy of our report to you unless you request otherwise.At your <br /> request,we can also send the report to additional project team members. <br /> Schedule <br /> Environmental Scope <br /> We anticipate the draft Phase I ESA report will be completed within 2 to 3 weeks from the date of your <br /> written authorization.The Phase I ESA report will remain in draft status until we are notified by you to <br /> proceed with issuance of the final Phase I ESA report. <br /> BRAUN <br />
The URL can be used to link to this page
Your browser does not support the video tag.