Laserfiche WebLink
1. INTRODUCTION <br /> The City of Ramsey has identified the need to prepare for further development of The COR. While much <br /> of The COR has been developed, additional infill is anticipated in the near future. The purpose of this <br /> analysis is to provide an update to the previous analysis, dated June of 2018, and determine the necessary <br /> public infrastructure and associated costs required to allow the remaining,undeveloped portions of The <br /> COR to develop. Additional analyses have supplemented the original report since 2018, including <br /> geotechnical evaluations,Ramsey Parkway median alternatives,wetland delineations, and traffic counts. <br /> Much of the information from the original report has been carried forward with this update. For <br /> reference, the following figures and exhibits are contained in the appendix of this report: <br /> Our analysis consists of three separate components that,when combined, provide an overview of the <br /> study area needs: <br /> • Preliminary Design Layouts—Provide graphical depictions of the public roadways and utilities, <br /> • Preliminary Project Cost Estimates—Provides a baseline for fiscal planning of the <br /> improvements, and <br /> • Final Report—Describes required infrastructure improvements, layouts and costs. <br /> For reference,the following figures and exhibits are contained in the appendix of this report: <br /> • Appendix A includes a previously prepared Land Use Plan for The COR, along with roadway <br /> related graphics from The COR Design Framework plan and City's Comprehensive Plan. <br /> • Appendix B includes figures referenced throughout this study, <br /> • Appendix C includes the geotechnical evaluation dated June 27, 2018, <br /> • Appendix D includes the wetland delineation report,completed in October 2022. The delineation <br /> is currently being reviewed by the Lower Rum River Watershed Management Organization <br /> (LRRWMO), <br /> • Appendix E includes the traffic counts collected in The COR in 2022, <br /> • Appendix F includes previously conducted analyses within The COR Framework, and <br /> • Appendix G includes The COR Tree Inventory Tabulation <br /> IL PRELIMINARY DESIGN LAYOUTS, FIGURES AND EXHIBITS <br /> To complete the analysis, existing conditions and proposed improvements were conceptually designed to <br /> allow for estimating construction costs. The figures contained in Appendix B form the basis for much of <br /> the analysis. The following list summarizes the figures contained in Appendix B: <br /> • Figures 1-5: Study Area Layouts <br /> • Figures 6-8: National Wetland Inventory&Mitigation Plan <br /> • Figures 9-11: Public Utilities <br /> • Figures 12-13: Site Grading& Drainage <br /> • Figures 14: The Waterfront,Phase 1 Sketch <br /> • Figures 15: The COR Area Tree Inventory <br /> • Figures 16-18: The COR Roadway Typical Sections <br /> Prepared by:Bolton&Menk,Inc. INTRODUCTION <br /> The COR Analysis I OR1.129128 Page 2 <br />