My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Front <br /> .' Ramsey,Minnesota <br /> INTII Project 1No. 18.IMSIP05470.000 <br /> 1.0 INTRODUCTION <br /> 1„1 Site/ Project Description <br /> The proposed project consists of the utilizing the on-site materials for construction in various locations. <br /> 1.2 Scope of Services <br /> The purpose of this factual report is to present a summary of our geotechnical exploration and provide <br /> the soil conditions encountered at the project area. Our"Scope of Services" was limited to the <br /> following: <br /> 1. Explore the project subsurface by means of nine (9)SPT soil borings. Six(6) SPT borings were <br /> advanced to depths between 23 and 30 feet and three (3) SPT borings were advanced to depths <br /> of approximately 14.5 feet existing grade. <br /> 2. Conduct laboratory test(s) on representative samples for characterizing the index and <br /> engineering properties of soils strata. <br /> 3. Provide a factual geotechnical report with the results of our field and laboratory tests. <br /> 2.0 EXPLORATION PROGRAM RESULTS <br /> 2.1 IExlplloiratioin Scope <br /> Site geotechnical exploration began on May 15, 2018,with individual SPT soil borings advanced to <br /> varying feet below existing grade at approximate locations as presented on the diagram within the <br /> appendices. Soil samples were taken at 2%-foot intervals to termination depth of the borings. <br /> NTI located the borings relative to existing site features, and determined the approximate elevation of <br /> the borings using MnTOPO LiDAR maps. Boring elevations should be considered to be approximate. <br /> Please refer to the Boring/Probe Location Diagram and the Boring Logs in Appendix C. <br /> The boreholes were backfilled with auger cuttings, or were abandoned using high solids bentonite or <br /> neat cement grout as per appropriate local and state statutes. Minor settlement of the boreholes will <br /> occur. Owner is responsible for final closure of the boreholes. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.