My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name and/or Number: Ramsey COR Wetland Analysis <br /> Attachment A <br /> Request for Delineation Review, Wetland Type Determination, or <br /> Jurisdictional Determination <br /> By submission of the enclosed wetland delineation report, I am requesting that the U.S.Army Corps of Engineers,St. Paul District <br /> (Corps)and/or the Wetland Conservation Act Local Government Unit(LGU) provide me with the following(check all that apply): <br /> ®Wetland Type Confirmation <br /> ® Delineation Concurrence. Concurrence with a delineation is a written notification from the Corps and a decision from the LGU <br /> concurring, not concurring,or commenting on the boundaries of the aquatic resources delineated on the property. Delineation <br /> concurrences are generally valid for five years unless site conditions change. Under this request alone,the Corps will not address <br /> the jurisdictional status of the aquatic resources on the property,only the boundaries of the resources within the review area <br /> (including wetlands,tributaries, lakes,etc.). <br /> ❑ Preliminary Jurisdictional Determination.A preliminary jurisdictional determination (PJD) is a non-binding written indication <br /> from the Corps that waters, including wetlands, identified on a parcel may be waters of the United States. For purposes of <br /> computation of impacts and compensatory mitigation requirements,a permit decision made on the basis of a PJD will treat all <br /> waters and wetlands in the review area as if they are jurisdictional waters of the U.S. PJDs are advisory in nature and may not be <br /> appealed. <br /> ®Approved Jurisdictional Determination.An approved jurisdictional determination (AJD) is an official Corps determination that <br /> jurisdictional waters of the United States are either present or absent on the property.AJDs can generally be relied upon by the <br /> affected party for five years.An AJD may be appealed through the Corps administrative appeal process. <br /> In order for the Corps and LGU to process your request,the wetland delineation must be prepared in accordance with the 1987 <br /> Corps of Engineers Wetland Delineation Manual, any approved Regional Supplements to the 1987 Manual,and the Guidelines for <br /> Submitting Wetland Delineations in Minnesota(2013). <br /> h.t:tp./../...www.:imy s.u e.:__rlm.y.:imp.1/M_iss.irk_n_sff u.l_a:taryfC.gg1JneaboinJ1DG u.id.n e as.lpx. <br /> An AJD is being requested for Wetlands 1, 2, 3,4, 5, 6, 7, and 8. These wetlands are being requested as non- <br /> jurisdictional under Section 404 of the CWA. <br /> Wetlands 3,5 and 6 are ponds excavated in upland and were not constructed with the intent of creating a wetland. These <br /> wetlands were observed to have distinct slopes and were excavated to be significantly lower than the surrounding area. <br /> Wetland 3 was constructed in 2011. Wetlands 5 and 6 were constructed in 2012. <br /> Wetlands 1,2,4, 7, and 8 are isolated basins that are not adjacent to or connected to any Waters of the U.S. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.