My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/28/2024
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2024
>
Agenda - Planning Commission - 03/28/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:30:19 AM
Creation date
3/22/2024 9:36:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pedestrian access to the site will come from a newly -constructed shared -use trail along 161st Avenue NW. A new <br />sidewalk will be built to connect the building's main entrance to this shared -use trail. Another sidewalk will run <br />west to east, parallel to the building's south facade, to connect to PACT Charter School's parking lot to the west. <br />Additional sidewalks will serve all secondary entrances to the building, as required by Minnesota State Building <br />Code. <br />Landscape Plan <br />As noted in the Environmental Policy Board's (EPB) recommendation from March 18, a Tree Inventory and <br />Preservation Plan was included with the submittal. Slightly over seventy percent (70%) of the existing DBH <br />inches of significant trees will be preserved, exceeding the tree preservation standards (in fact, the plan includes <br />removing some Siberian Elm, an invasive species, so the percentage of significant tree DBH inches preserved on <br />site is likely slightly greater since the removal calculations include the DBH inches of Siberian Elm). As the <br />church expands parking areas in the future, there will be additional tree losses, but additional plantings would be <br />installed, at a minimum rate of one (1) tree for every ten (10) new parking stalls. The majority of tree removal <br />will be done to account for stormwater ponding (exempt from removal calculations) and the building pad. <br />A Landscape Plan was included with the submittal. Over 300 existing deciduous and evergreen trees are being <br />preserved, and the Applicant is utilizing these to partially meet the landscape requirements. They are proposing to <br />install seventeen (17) new trees, including a combination of overstory, ornamental, and evergreen trees. The plan <br />also includes ninety-two (92) shrubs, including both evergreen and deciduous species. Staff has recommended <br />relocating some of the proposed shrubs between the trees being installed along 161st Avenue, just to provide a bit <br />more screening for the home(s) on the south side of this road. Ground cover will be a mixture of sod against the <br />building and entrance, and various seed mixes (low maintenance turf and a stormwater mix). <br />Utilities <br />The building will be connected to municipal water and sanitary sewer. <br />Storm Water Management <br />Storm water will be managed northwest of the site in a shared basin with PACT Charter School. The stormwater <br />plan will be reviewed by the Lower Rum River WMO. <br />Final Plat <br />The Subject Property was platted in 2022 as Outlot B, PACT Addition, as part of a land sale to PACT Charter <br />School for their new school, located immediately to the west. The PACT Addition plat established Drainage and <br />Utility Easements along all four sides of the Subject Property; these easements are 10 feet wide along the south <br />(161st Avenue NW) and east (Variolite Street NW) sides of the property, and are 5 feet wide along the north and <br />west sides of the property. Also in 2022, a Reciprocal Easement Agreement was recorded on the property, <br />allowing cross -access, shared parking, and shared drainage between the PACT Charter School and the Subject <br />Property. Another agreement was recorded in August 2023 to further establish a Stormwater Treatment and <br />Ponding Maintenance Agreement between PACT, the Church of Saint Katharine Drexel, and the City. With the <br />Final Plat, the Applicant proposed to plat one existing outlot into one buildable lot to accommodate a religious <br />institutional use. <br />Alternatives <br />Alternative 1: Recommend approval of the Site Plan and Final Plat as recommended by Staff. <br />Alternative 2: Recommend approval of the Site Plan and Final Plat with modifications based on discussion. <br />Alternative 3: Recommend denial of the Site Plan and Final Plat based on supporting findings of fact. <br />Funding Source: <br />All costs associated with this request are the Applicant's responsibility. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.