My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 03/26/2024
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2024
>
Agenda - Council Work Session - 03/26/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:12:56 AM
Creation date
4/2/2024 11:26:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
03/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City 0 <br /> 7550 Sunwood Drive NW <br /> Ramsey,MN 55303 <br /> City Hall: 763.427.1410 • Fax; 763.427.5543 <br /> f ■ <br /> www,crtyo, fra m s ey.com <br /> w.: <br /> -1 V <br /> . ............................... ....... <br /> __ r.. ,. <br /> � ................... ............ <br /> ._ <br /> F , <br /> .......... <br /> ............ <br /> POTENTIAL PEDESTRIAN TRAI <br /> L CONNECTION SUR <br /> VEY (IP #24-07) <br /> of this Survey <br /> y <br /> The City of Ramsey is seeking inpu <br /> t from residents of Bowers Drive and the Riverstone South development on <br /> whether a 10-foot bituminous pedestrian trail connection would be supported between Bowers Drive and the <br /> new Riverstone South developmen <br /> t. Enclosed is an exhibit showing the location of the potential pedestrian <br /> trail.connection corr <br /> idor as well as amenities this trail would provide more convenient access to. <br /> , <br /> o process,the City surveyed During the Riverstone South development d Bowers Drive residents to see if they <br /> p p . <br /> supportedand Public works maintenance <br /> construction of a public road connection,a Public Safety that <br /> connection,or no sec <br /> ond connection to Bowers Drive at all. The results of that survey demonstrated <br /> pp <br /> Bowers Drive residents did not support a second connection between Bowers Drive and the new Riverstone <br /> the City Council voted to not construct a second access road. However,it <br /> South development. At the time, ty <br /> was also decided that this topic should be explored again if/when a future opportunity presented itself. <br /> receive pavement overlay improvements with 2024 Neighborhood <br /> In 2024,Bowers Drive is proposed to rece Pavement connection could be cost-effectively effective <br /> vement Overlays,Improvement Project#24-07,and a paved trail uncil <br /> constructed as part of this prof ect. Staff will therefore share the results of this survey with the City Co <br /> while discussing whether to add a pede <br /> strian trail connection to the project. If a trail connection were to be <br /> constructed,there would be no direct cost to local residents. <br /> Property owner Contact Information and that the name <br /> The City requests ests that onlyone response be submitted per property receiving this survey, <br /> and address of the respondent be provided below. j s <br /> � 7) <br /> CJ <br /> Property owner Name. s <br /> Property Address. <br /> Survey Question <br /> ecti i to area amenities,do you support a second access to Bowers Drive? <br /> For purposes of pedestrian connv <br /> YES,1 support a paved pedestrian trail connection. <br /> No,I do not support a paved pedestrian trail connection. <br /> Comments: eci 45�? 19 oe. <br /> •' r� __ .ram <br /> 70 <br /> Please return In tie enclosed seitaddresse ,stampe.. env <br /> elo a Marc <br /> . s o��sibi row our conr�szr�aity,and to provide quality,cost-effective and efficient government <br /> it is our mission to work together to rep y g <br /> services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.