My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 04/11/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 04/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:35:13 AM
Creation date
4/12/2024 1:10:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
04/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park and Recreation Commission 5.3. <br /> Meeting Date: 04/11/2024 <br /> By: Mark Riverblood, Engineering/Public Works <br /> Information <br /> Title: <br /> Recommend a$350,000 Budget and Playground Installation for The Hollow <br /> Purpose/Background: <br /> A 243 lot residential subdivision was approved by the City in 2021 entitled Riverstone South—and is generally <br /> south of Hwy's#10 © and north of the Bowers Drive residential area. As part of the planning process in <br /> 2020-21 it was determined that Park Dedication for the new plat would consist of one acre for a neighborhood <br /> park, and$350,000 in cash for the park's development. <br /> The purpose of this case is to formally recommend to City Council the overall plan and budget for the park, and <br /> specifically the large and unique playground consistent with the concept plans that the Commission previously <br /> approved. <br /> Notification: <br /> Substantial public engagement,workshops and Public Hearings occurred in 2020 and 2021 leading up to the plat's <br /> approval. <br /> Observations/Alternatives: <br /> One of the stated goals for the park in this location was to preserve the existing trees—and then to incorporate the <br /> trees with the playground elements. The approved concept plan is the result of considerable planning to achieve <br /> these goals and to remain within the $350,000 park development budget. On April 1 st, 2024 the Lump Sum <br /> Proposals were due to the city for all the wooden platforms,bridge and elevated boardwalks that the playground <br /> elements would be attached to, or interact with. The 300' feet of boardwalk elements with installation is <br /> $138,200. The play equipment components to be attached to the boardwalk are available from the State Bid <br /> Contract and are $38,705 including shipping and freight. These components will be purchased by the City <br /> directly,with the boardwalk contractor attaching and integrating them into the larger elevated boardwalk <br /> platforms. The zip line is one of these components that was available from the State Contract, and was installed <br /> last Summer($24,949). <br /> Additional information will be presented at the meeting, including a revised budget reflecting the detailed <br /> numbers above,but remaining within the total of$350,000. <br /> Funding Source: <br /> The funding source is the $350,000 in Park Dedication fees paid by the Developer of the residential subdivision. <br /> Recommendation: <br /> Staff recommends proceeding with the construction of the playground at The Hollow as described in this <br /> case. <br /> Action: <br />
The URL can be used to link to this page
Your browser does not support the video tag.