Laserfiche WebLink
Burke 550-0206 ZipVentuure Zap Line(75')Oty:1 <br /> $17,562 each INSTALLED 2023 <br /> The approximate 70' foot Zip line shown above is installed at the park. The Contractor <br /> shall field engineer a wooden boardwalk type connection between the adjacent 2' foot <br /> high platform, to the zip line's existing upper deck. The wood boardwalk may be <br /> fastened to the zip line platform and/or its support posts and meet CPS guidelines. <br /> O irke##370-0,7 3 <br /> V xure Play Board CIliiir ber <br /> 01y: 2 <br /> $2,105 each <br /> 10 <br /> i <br /> g w <br /> i <br /> i f <br /> l <br /> I <br /> a <br /> r � <br /> J % <br /> i <br /> �i;r rt �� .r,�r'�, ✓r <br /> 13 Fillw +'u <br />