Laserfiche WebLink
Notification: <br /> A Public Hearing was conducted in December 2023 on the city-wide Capital Improvement Plan, and park <br /> improvements in Ramsey's downtown were identified as a proposed 2024 project. Additionally, if an advisory <br /> question is placed on the November General Election Ballot, the city would prepare information on the <br /> project to include amenities and benefits as well as financial impact on the property tax levy. This <br /> would be disseminated through the website, social media, QCTV, handouts at events and the Ramsey <br /> Resident. <br /> Time Frame/Observations/Alternatives: <br /> Observations <br /> Following the work session consensus to proceed to develop more accurate cost estimates (Schematic Design), the <br /> attached proposal was received by Cuningham that addresses the scope of work and the approximate 8-week <br /> time-frame(such that Council can consider a ballot question by an August 2024 deadline). This proposal <br /> describes that the "Architect builds on the concept design services and establishes a design vision: the parameters <br /> and principles that will guide the Project forward in alignment with Owner's brand and mission. Tasks during <br /> this phase include:program development, circulation diagrams, net and gross area calculations, initial site <br /> design, building character studies, material research, and coordination with design team consultants as <br /> necessary, and Owner progress meetings (weekly)." <br /> This would result in a preliminary building model which includes preliminary building plans,preliminary building <br /> sections,preliminary building elevations, as well as the required mechanical, electrical,plumbing, and structural <br /> engineering, for a stipulated sum of$267,500. <br /> Alternatives <br /> Alternatives include: <br /> 1)Not proceeding to Schematic Design at this time. <br /> 2) Proceeding with Schematic Design. <br /> 3) Some other unspecified option. <br /> Staff recommends proceeding with Schematic Design, which will be valuable information even if the <br /> Council chooses not to move forward with The Waterfront community building within the next year(s). <br /> Funding Source: <br /> Funding for the preliminary design and identifying the probable costs (Schematic Design) for The Waterfront <br /> community building would be appropriate from the Park Trust Fund,which has a present balance of <br /> approximately $7.4M. <br /> Recommendation: <br /> Staff recommends that the Council authorize the Schematic Design phase for the proposed Waterfront community <br /> building to determine probable construction costs for this prominent and valuable investment for the community. <br /> Outcome/Action: <br /> Based upon discussion;motion to authorize the City Administrator to enter into an agreement with Cuningham <br /> for Schematic Design services for the proposed Waterfront community building, at a not-to-exceed cost of <br /> $270,000 from the Park Trust Fund. <br /> Attachments <br /> Schematic Design proposal <br /> Community building program <br /> Building program description <br /> splash pad planning <br />