Laserfiche WebLink
Exhibit <br /> .2 Construction commencement date: <br /> .3 Substantial Completion date or dates: <br /> .4 Other milestone dates, <br /> §1.1.5 The Owner intends the following procurement and delivery method for the Project: <br /> (Identify method such as competitive bid or negotiated contract, as well as any requirements for accelerated or fast- <br /> track design and construction, multiple bid packages, or phased construction.) <br /> §1.1.6 The Owner's anticipated Sustainable Objective for the Project: <br /> (Identify and describe the Owner's Sustainable Objective for the Project, if any) <br /> §1.1.6.1 If the Owner identifies a Sustainable Objective,the Owner and Architect shall complete and incorporate <br /> AIA Document E204Tm-2017, Sustainable Projects Exhibit,into this Agreement to define the terms,conditions and <br /> services related to the Owner's Sustainable Objective. If E204-2017 is incorporated into this agreement,the Owner <br /> and Architect shall incorporate the completed E204-2017 into the agreements with the consultants and contractors <br /> performing services or Work in any way associated with the Sustainable Objective. <br /> §1.1.7 The Owner identifies the following representative in accordance with Section 5.3: <br /> (List name, address, and other contact information) <br /> §1.1.8 The persons or entities,in addition to the Owner's representative,who are required to review the Architect's <br /> submittals to the Owner are as follows: <br /> (List name, address, and other contact information.) <br /> §1-1.9 The Owner shall retain the following consultants and contractors.- <br /> (List name, legal status, address, and other contact information) <br /> .1 Geotechnical Engineer: <br /> Init. AIA Document BI 01 TM—2017.Copyright©1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING: <br /> This AIA' Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAO Document, 3 <br /> or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This <br /> document was produced by AIA software at 14:48:43 on 12/12/2017 under Order No.3422979013 which expires on 11/08/2018,and is not for resale, <br /> User Notes: (3139ADMD) <br />