My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:15:44 AM
Creation date
4/23/2024 1:41:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit <br /> §2.5.4 Workers' Compensation at statutory limits. <br /> §2.5.5 Employers' Liability with policy limits not less than ($ each accident, ($ each employee, and ($ <br /> )policy limit. <br /> §2.5.6 Professional Liability covering negligent acts, errors and omissions in the performance of professional <br /> services with policy limits of not less than ($ )per claim and ($ )in the aggregate. <br /> §2.5.7 Additional Insured Obligations.To the fullest extent permitted by law, the Architect shall cause the primary <br /> and excess or umbrella polices for Commercial General Liability and Automobile Liability to include the Owner as <br /> an additional insured for claims caused in whole or in part by the Architect's negligent acts or omissions. The <br /> additional insured coverage shall be primary and non-contributory to any of the Owner's insurance policies and shall <br /> apply to both ongoing and completed operations. <br /> §2.5.8 The Architect shall provide certificates of insurance to the Owner that evidence compliance with the <br /> requirements in this Section 2.5. <br /> ARTICLE 3 SCOPE OF ARCHITECT'S BASIC SERVICES <br /> §3.1 The Architect's Basic Services consist of those described in this Article 3 and include usual and customary <br /> structural,mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental <br /> or Additional Services. <br /> §3.1.1 The Architect shall manage the Architect's services,research applicable design criteria,attend Project <br /> meetings, communicate with members of the Project team,and report progress to the Owner. <br /> §3.1.2 The Architect shall coordinate its services with those services provided by the Owner and the Owner's <br /> consultants. The Architect shall be entitled to rely on, and shall not be responsible for,the accuracy, completeness, <br /> and timeliness of, services and information ftiriiished by the Owner and the Owner's consultants. The Architect shall <br /> provide prompt written notice to the Owner if the Architect becomes aware of any error,omission, or inconsistency <br /> in such services or information. <br /> §3.1.3 As soon as practicable after the date of this Agreement,the Architect shall submit for the Owner's approval a <br /> schedule for the performance of the Architect's services. The schedule initially shall include anticipated dates for the <br /> commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. <br /> The schedule shall include allowances for periods of time required for the Owner's review, for the performance of <br /> the Owner's consultants,and for approval of submissions by authorities having jurisdiction over the Project. Once <br /> approved by the Owner,time limits established by the schedule shall not, except for reasonable cause,be exceeded <br /> by the Architect or Owner.With the Owner's approval,the Architect shall adjust the schedule, if necessary, as the <br /> Project proceeds until the commencement of construction. <br /> §3.1.4 The Architect shall not be responsible for an Owner's directive or substitution, or for the Owner's acceptance <br /> of non-conforming Work,made or given without the Architect's written approval. <br /> §3.1.5 The Architect shall contact governmental authorities required to approve the Construction Documents and <br /> entities providing utility services to the Project. The Architect shall respond to applicable design requirements <br /> imposed by those authorities and entities. <br /> §3.1.6 The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents <br /> required for the approval of governmental authorities having jurisdiction over the Project. <br /> §3.2 Schematic Design Phase Services <br /> §3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, <br /> codes, and regulations applicable to the Architect's services. <br /> §3.2.2 The Architect shall prepare a preliminary evaluation of the Owner's program, schedule,budget for the Cost <br /> of the Work,Project site,the proposed procurement and delivery method, and other Initial Information,each in <br /> Init. AIA Document 1310111*m—2017.Copyright 1974,1976,1967,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING: <br /> This AIA° Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAO Document, 6 <br /> or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This <br /> document was produced by AIA software at 14:48:43 on 12/12/2017 under Order No.3422979013 which expires on 11/08/2018,and is not for resale. <br /> User Notes- (3139ADAII D) <br />
The URL can be used to link to this page
Your browser does not support the video tag.