My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 04/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:15:44 AM
Creation date
4/23/2024 1:41:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit <br /> Section 4.23 the Architect shall prepare Change Orders and Construction Change Directives for the Owner's <br /> approval and execution in accordance with the Contract Documents. <br /> §3.6.5.2 The Architect shall maintain records relative to changes in the Work. <br /> §3.6.6 Project Completion <br /> §3.6.6.1 The Architect shall: <br /> .1 conduct inspections to determine the date or dates of Substantial Completion and the date of final <br /> completion; <br /> .2 issue Certificates of Substantial Completion; <br /> .3 forward to the Owner,for the Owner's review and records,written warranties and related documents <br /> required by the Contract Documents and received from the Contractor; and, <br /> .4 issue a final Certificate for Payment based upon a final inspection indicating that,to the best of the <br /> Architect's knowledge,information,and belief,the Work complies with the requirements of the <br /> Contract Documents. <br /> §3.6.6.2 The Architect's inspections shall be conducted with the Owner to check conformance of the Work with the <br /> requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the <br /> Contractor of Work to be completed or corrected. <br /> §3.6.6.3 when Substantial Completion has been achieved,the Architect shall inform the Owner about the balance of <br /> the Contract Sum remaining to be paid the Contractor,including the amount to be retained from the Contract Sum,if <br /> any,for final completion or correction of the Work. <br /> §3.6.6.4 The Architect shall forward to the Owner the following information received from the Contractor: (1) <br /> consent of surety or sureties,if any,to reduction in or partial release of retainage or the making of final payment;(2) <br /> affidavits,receipts,releases and waivers of liens,or bonds indemnifying the Owner against liens;and(3)any other <br /> documentation required of the Contractor under the Contract Documents. <br /> §3.6.6.5 Upon request of the Owner,and prior to the expiration of one year from the date of Substantial Completion, <br /> the Architect shall,without additional compensation,conduct a meeting with the Owner to review the facility <br /> operations and performance. <br /> ARTICLE 4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> §4.1 Supplemental Services <br /> §4.1.1 The services listed below are not included in Basic Services but may be required for the Project. The <br /> Architect shall provide the listed Supplemental Services only if specifically designated in the table below as the <br /> Architect's responsibility,and the Owner shall compensate the Architect as provided in Section 11.2.Unless <br /> otherwise specifically addressed in this Agreement,if neither the Owner nor the Architect is designated,the parties <br /> agree that the listed Supplemental Service is not being provided for the Project. <br /> (Designate the Architect"s Supplemental Services and the Owner's Supplemental Services required for the Project <br /> by indicating whether the Architect or Owner shall be responsible for providing the identified Supplemental Service. <br /> Insert a description of the Supplemental Services in Section 4.1.2 below or attach the description of services as an <br /> exhibit to this Agreement.) <br /> Supplemental Services Responsibility <br /> (Architect, Owner, or notprovided) <br /> §4.1.1.1 Programming <br /> §4.1.1.2 Multiple preliminary designs <br /> §4.1.1.3 Measured drawings <br /> §4.1.1.4 Existing facilities surveys <br /> §4.1.1.5 Site evaluation and planning <br /> §4.1.1.6 Building Information Model management <br /> responsibilities <br /> §4.1.1.7 Development of Building Information Models for <br /> post construction use <br /> AIA Document 8101 TM—2017.Copyright©1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING: <br /> Init. This Afk, Document.is protected by U.S.Copyright Law and International`I`roatiss.Unauthorized reproduction or distribution of this AIM,Document, <br /> or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This <br /> document was produced by AIA software at 14:48:43 on 12/12/2017 under Order No.3422979013 which expires on 11/08/2018,and is not for resale. <br /> User Notes: (3139ADAID) <br />
The URL can be used to link to this page
Your browser does not support the video tag.